3M - 303 WORK CENTER SUPERVISOR
Study online at https://quizlet.com/_hpsblc
1. What is status 2 IEM
A Equipment scheduled for overhaul for 7 days or greater
B equipment not scheduled for overhaul for 30 days or greater
C Equipment scheduled for overhaul for 30 days or greater
D Equipment not scheduled for overhaul for 7 days or greater: A Equipment scheduled
for overhaul for 7 days or greater
2. What does JSN stand for?
A job source number
B job sequence nomenclature
C Job source Name
D Job sequence number: D Job Sequence Number
3. Which Symbol following a periodicity code indicates that the procedure is
intended to be scheduled and performed by either ships force or off-ship
Maintenance personnel?
A two plus signs
B at symbol
C pound sign
D Percent symbol: A Two plus signs
4. Who can complete weekly close out of maintenance in the absence of the
DIVO?
A LCPO
B DH
C WCS
D LPO: A LCPO
5. Who is responsible for reviewing PMS assignments, perform quality mainte-
nance IAW procedural documentation?
A Work center supervisor
B Department Head
, 3M - 303 WORK CENTER SUPERVISOR
Study online at https://quizlet.com/_hpsblc
C Maintenance Person
D Commanding officer: C Maintenance Person
6. The number assigned to tools, parts, materials and test equipment on the
MRC which can be referenced to the standard PMS materials Identification
Guide (SPMIG) for stock number identification is known as?
A JSN
B NSN
C SPIN
D NIIN: C SPIN
7. What color of paper are classified MRC's printed on?: Pink
8. What does TGL stand for?
A Tag guide list
B Tag guide log
C tag out list
D tag guide leader: A Tag Guide List
9. A paper printed TORS or electronic form from ESOMS will be maintained for
how long?
A 1 week
B 13 weeks
C 6months
D 52 weeks: B 13 weeks
10. Who has overall responsibility for ensuring maintenance is accomplished
following the 3M system?
A XO
B CO
C DIVO
D WCS: B Commanding Officer
, 3M - 303 WORK CENTER SUPERVISOR
Study online at https://quizlet.com/_hpsblc
11. Technical PMS discrepancies that could have a detrimental effect on personal
safety, safety of ship or could result in significant equipment damage are
classified as what type of technical feed back report?
A Safety
B emergent
C urgent
D routing: C Urgent
12. What documentation supersedes all planned or preventative maintenance
systems or programs?
A tech pubs
B NTSM
C EOSS
D PMS: PMS
13. MIPS/MRCs not scheduled that are required are called?
A lost
B non accomplished
C omitted
D rescheduled: C Omitted
14. Which of the following is NOT listed on the List of Effective Pages?
A unit identification code
B situational requirement report
C work center
D fr number: B Situational Requirement Report
15. What provides detailed procedures for performing maintenance require-
ments and describes who, what, how and with what resources a specific main-
tenance requirement will be accomplished?
A FBR
B ACN
Study online at https://quizlet.com/_hpsblc
1. What is status 2 IEM
A Equipment scheduled for overhaul for 7 days or greater
B equipment not scheduled for overhaul for 30 days or greater
C Equipment scheduled for overhaul for 30 days or greater
D Equipment not scheduled for overhaul for 7 days or greater: A Equipment scheduled
for overhaul for 7 days or greater
2. What does JSN stand for?
A job source number
B job sequence nomenclature
C Job source Name
D Job sequence number: D Job Sequence Number
3. Which Symbol following a periodicity code indicates that the procedure is
intended to be scheduled and performed by either ships force or off-ship
Maintenance personnel?
A two plus signs
B at symbol
C pound sign
D Percent symbol: A Two plus signs
4. Who can complete weekly close out of maintenance in the absence of the
DIVO?
A LCPO
B DH
C WCS
D LPO: A LCPO
5. Who is responsible for reviewing PMS assignments, perform quality mainte-
nance IAW procedural documentation?
A Work center supervisor
B Department Head
, 3M - 303 WORK CENTER SUPERVISOR
Study online at https://quizlet.com/_hpsblc
C Maintenance Person
D Commanding officer: C Maintenance Person
6. The number assigned to tools, parts, materials and test equipment on the
MRC which can be referenced to the standard PMS materials Identification
Guide (SPMIG) for stock number identification is known as?
A JSN
B NSN
C SPIN
D NIIN: C SPIN
7. What color of paper are classified MRC's printed on?: Pink
8. What does TGL stand for?
A Tag guide list
B Tag guide log
C tag out list
D tag guide leader: A Tag Guide List
9. A paper printed TORS or electronic form from ESOMS will be maintained for
how long?
A 1 week
B 13 weeks
C 6months
D 52 weeks: B 13 weeks
10. Who has overall responsibility for ensuring maintenance is accomplished
following the 3M system?
A XO
B CO
C DIVO
D WCS: B Commanding Officer
, 3M - 303 WORK CENTER SUPERVISOR
Study online at https://quizlet.com/_hpsblc
11. Technical PMS discrepancies that could have a detrimental effect on personal
safety, safety of ship or could result in significant equipment damage are
classified as what type of technical feed back report?
A Safety
B emergent
C urgent
D routing: C Urgent
12. What documentation supersedes all planned or preventative maintenance
systems or programs?
A tech pubs
B NTSM
C EOSS
D PMS: PMS
13. MIPS/MRCs not scheduled that are required are called?
A lost
B non accomplished
C omitted
D rescheduled: C Omitted
14. Which of the following is NOT listed on the List of Effective Pages?
A unit identification code
B situational requirement report
C work center
D fr number: B Situational Requirement Report
15. What provides detailed procedures for performing maintenance require-
ments and describes who, what, how and with what resources a specific main-
tenance requirement will be accomplished?
A FBR
B ACN