The initial response to a frequency deviation is due to which of
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
the following |\
1. Load / frequency response
|\ |\ |\ |\ |\
2. AGC
|\
3. Governor action
|\ |\
4. Interchange schedules
|\ |\
•3 and 4 |\ |\
•1 and 2 |\ |\
•2 and 3 |\ |\
•1 and 3 - CORRECT ANSWERS ✔✔•1 and 3
|\ |\ |\ |\ |\ |\ |\ |\
EMS and AGC have failed at 12:25 and generation must be
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
controlled manually. The operator calculates ACE to be +25 MWs.
|\ |\ |\ |\ |\ |\ |\ |\ |\
Load is expected to increase 100 MWs, and imports will increase
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
by 75 MWs at the top of the hour. What should the operator do?
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
•Maintain current generation level |\ |\ |\
•Decrease generation by 25 MWs |\ |\ |\ |\
•Decrease generation by 50 MWs |\ |\ |\ |\
•Increase generation by 25 MW - CORRECT ANSWERS|\ |\ |\ |\ |\ |\ |\ |\
✔✔•Decrease generation by 25 MWs |\ |\ |\ |\
,How is the Frequency Response Measure (FRM) of a Balancing
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
Authority determined? |\
•lt is the average of the BA's frequency response for all the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
frequency deviations of the previous year |\ |\ |\ |\ |\
•lt is the change in the BA's Net Interchange Actual for the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
largest frequency deviation during the previous year
|\ |\ |\ |\ |\ |\
•lt is the previous year's Control Performance Standard 1 ( CPS1 )
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
score
|\
•It is the median of the BA's frequency response for the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
frequency deviation events identified by NERC for the previous
|\ |\ |\ |\ |\ |\ |\ |\ |\
year - CORRECT ANSWERS ✔✔•It is the median of the BA's
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
frequency response for the frequency deviation events identified
|\ |\ |\ |\ |\ |\ |\ |\
by NERC for the previous year
|\ |\ |\ |\ |\
Sufficient Operating Reserve is defined as the capacity required
|\ |\ |\ |\ |\ |\ |\ |\ |\
to meet what?
|\ |\
•DOE specifications |\
•CPS and DCS |\ |\
•CPS 1 & 2 only |\ |\ |\ |\
•Capacity Standard - CORRECT ANSWERS ✔✔•CPS and DCS |\ |\ |\ |\ |\ |\ |\
In your Interconnection , a generator tripped that was large
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
enough to reduce the frequency from 60.00 Hz to 59.94 Hz . Your
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
Balancing Authority's Frequency Bias is -200 MW / 0.1 Hz . How
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
many MW would your system initially contribute to frequency
|\ |\ |\ |\ |\ |\ |\ |\ |\
support?
,•120 MW |\
•80 MW
|\
•100 MW |\
•200 MW - CORRECT ANSWERS ✔✔•120 MW
|\ |\ |\ |\ |\ |\
Interconnection frequency is 59.80 Hz . Your ACE is a large |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
negative value and your AGC is pulsing your units down . What
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
should you do |\ |\
•Leave AGC in operation but investigate
|\ |\ |\ |\ |\
•Place AGC in constant frequency control
|\ |\ |\ |\ |\
•Place AGC in flat tie line control
|\ |\ |\ |\ |\ |\
•Suspend AGC and investigate - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\
✔✔•Suspend AGC and investigate |\ |\ |\
When a Balancing Authority's ACE value is the same sign as the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
frequency deviation , which NERC control performance score is
|\ |\ |\ |\ |\ |\ |\ |\ |\
affected negatively |\
•DCS
•CPS 1 |\
•TEC
•BAAL - CORRECT ANSWERS ✔✔•CPS 1
|\ |\ |\ |\ |\
, Correct Of the following , which control system would be affected
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
by a difference in Net Actual Interchange and Net Scheduled
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
Interchange
•Reactive Control |\
•Turbine Governor Control |\ |\
•Automatic Generation Control |\ |\
•Automatic Voltage Regulator - CORRECT ANSWERS |\ |\ |\ |\ |\ |\
✔✔•Automatic Generation Control |\ |\
Balancing Authority A is currently reading a system frequency of
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
59.98 Hz . Its Net Actual Interchange is +100 MW and its Net
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
Scheduled Interchange is +100 MW . If Balancing Authority A's|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
frequency bias setting is 100 MW / 0.1 HZ , what is ACE |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
• -20|\
•20
•2
•0 - CORRECT ANSWERS ✔✔• -20
|\ |\ |\ |\ |\
A Balancing Authority has twenty units on governor control . The
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
units have different capacities that range from 200 MW to 1000
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
MW and droop settings from 2 % to 5 % . The biggest
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
adjustments in megawatt output in response to a frequency |\ |\ |\ |\ |\ |\ |\ |\ |\
disturbance will be provided by units that have _______________? |\ |\ |\ |\ |\ |\ |\ |\
•large capacity and small droop setting
|\ |\ |\ |\ |\
|\ |\ |\ |\ |\
The initial response to a frequency deviation is due to which of
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
the following |\
1. Load / frequency response
|\ |\ |\ |\ |\
2. AGC
|\
3. Governor action
|\ |\
4. Interchange schedules
|\ |\
•3 and 4 |\ |\
•1 and 2 |\ |\
•2 and 3 |\ |\
•1 and 3 - CORRECT ANSWERS ✔✔•1 and 3
|\ |\ |\ |\ |\ |\ |\ |\
EMS and AGC have failed at 12:25 and generation must be
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
controlled manually. The operator calculates ACE to be +25 MWs.
|\ |\ |\ |\ |\ |\ |\ |\ |\
Load is expected to increase 100 MWs, and imports will increase
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
by 75 MWs at the top of the hour. What should the operator do?
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
•Maintain current generation level |\ |\ |\
•Decrease generation by 25 MWs |\ |\ |\ |\
•Decrease generation by 50 MWs |\ |\ |\ |\
•Increase generation by 25 MW - CORRECT ANSWERS|\ |\ |\ |\ |\ |\ |\ |\
✔✔•Decrease generation by 25 MWs |\ |\ |\ |\
,How is the Frequency Response Measure (FRM) of a Balancing
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
Authority determined? |\
•lt is the average of the BA's frequency response for all the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
frequency deviations of the previous year |\ |\ |\ |\ |\
•lt is the change in the BA's Net Interchange Actual for the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
largest frequency deviation during the previous year
|\ |\ |\ |\ |\ |\
•lt is the previous year's Control Performance Standard 1 ( CPS1 )
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
score
|\
•It is the median of the BA's frequency response for the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
frequency deviation events identified by NERC for the previous
|\ |\ |\ |\ |\ |\ |\ |\ |\
year - CORRECT ANSWERS ✔✔•It is the median of the BA's
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
frequency response for the frequency deviation events identified
|\ |\ |\ |\ |\ |\ |\ |\
by NERC for the previous year
|\ |\ |\ |\ |\
Sufficient Operating Reserve is defined as the capacity required
|\ |\ |\ |\ |\ |\ |\ |\ |\
to meet what?
|\ |\
•DOE specifications |\
•CPS and DCS |\ |\
•CPS 1 & 2 only |\ |\ |\ |\
•Capacity Standard - CORRECT ANSWERS ✔✔•CPS and DCS |\ |\ |\ |\ |\ |\ |\
In your Interconnection , a generator tripped that was large
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
enough to reduce the frequency from 60.00 Hz to 59.94 Hz . Your
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
Balancing Authority's Frequency Bias is -200 MW / 0.1 Hz . How
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
many MW would your system initially contribute to frequency
|\ |\ |\ |\ |\ |\ |\ |\ |\
support?
,•120 MW |\
•80 MW
|\
•100 MW |\
•200 MW - CORRECT ANSWERS ✔✔•120 MW
|\ |\ |\ |\ |\ |\
Interconnection frequency is 59.80 Hz . Your ACE is a large |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
negative value and your AGC is pulsing your units down . What
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
should you do |\ |\
•Leave AGC in operation but investigate
|\ |\ |\ |\ |\
•Place AGC in constant frequency control
|\ |\ |\ |\ |\
•Place AGC in flat tie line control
|\ |\ |\ |\ |\ |\
•Suspend AGC and investigate - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\
✔✔•Suspend AGC and investigate |\ |\ |\
When a Balancing Authority's ACE value is the same sign as the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
frequency deviation , which NERC control performance score is
|\ |\ |\ |\ |\ |\ |\ |\ |\
affected negatively |\
•DCS
•CPS 1 |\
•TEC
•BAAL - CORRECT ANSWERS ✔✔•CPS 1
|\ |\ |\ |\ |\
, Correct Of the following , which control system would be affected
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
by a difference in Net Actual Interchange and Net Scheduled
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
Interchange
•Reactive Control |\
•Turbine Governor Control |\ |\
•Automatic Generation Control |\ |\
•Automatic Voltage Regulator - CORRECT ANSWERS |\ |\ |\ |\ |\ |\
✔✔•Automatic Generation Control |\ |\
Balancing Authority A is currently reading a system frequency of
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
59.98 Hz . Its Net Actual Interchange is +100 MW and its Net
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
Scheduled Interchange is +100 MW . If Balancing Authority A's|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
frequency bias setting is 100 MW / 0.1 HZ , what is ACE |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
• -20|\
•20
•2
•0 - CORRECT ANSWERS ✔✔• -20
|\ |\ |\ |\ |\
A Balancing Authority has twenty units on governor control . The
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
units have different capacities that range from 200 MW to 1000
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
MW and droop settings from 2 % to 5 % . The biggest
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
adjustments in megawatt output in response to a frequency |\ |\ |\ |\ |\ |\ |\ |\ |\
disturbance will be provided by units that have _______________? |\ |\ |\ |\ |\ |\ |\ |\
•large capacity and small droop setting
|\ |\ |\ |\ |\