• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 14 pages
Exam (elaborations)

CCM Certification2026/2027 Questions And Correct Detailed Answers With Rationales

Document preview thumbnail
Preview 2 out of 14 pages

This document contains questions and verified answers for CCM Certification . It includes detailed explanations, revision-focused content, and exam preparation material suitable for 2026/2027 students.

Content preview

CCM Certification

3 Meeting Types in Construction Phase - ANS-pre-creation, development, and special
conferences.

5 C's - ANS-1. Clarity
2. Completeness
3. Constructibility
4. Compliance (with owner's program)
5. Coordination (many of the trades and contractors as appropriate).

Addendum - ANS-A supplement to documents, issued prior to taking receipt of bids, for the
cause of clarifying, correcting, or otherwise converting bid documents formerly issued.

Additional Services - ANS-Services provided similarly to those particularly distinct as primary
services in the settlement among the owner and CM. Also known as supplemental services.

Agency - ANS-A legal dating by which one birthday party (agent) is empowered and obligated to
act on behalf of some other birthday celebration (proprietor).

Agency Construction Management - ANS-shape of production management performed in a
defined courting among the CM and proprietor. The enterprise form of construction control
establishes a specific function of the CM acting as the owner's primary agent in connection with
the mission/application.

Agreement - ANS-A record placing forth the relationships and responsibilities between two
parties, because the CM and owner or contractor and owner. It may additionally incorporate
different files by reference.

An sum of money usually set on a in step with day foundation, which the contractor concurs to
pay the owner for postpone in completing the work according with the contract files. -
ANS-Material or equipment having an prolonged delivery time. Such objects may be taken into
consideration for early procurement and buy under separate settlement to facilitate on time of
completion of the mission.

Apparent Low Bidder - ANS-The bidder who has submitted the lowest bid for a department of
work described in bid files, an offer shape, or proposed settlement.

Approved Bidders List - ANS-The listing of contractors which have been prequalified for the
reason of submitting accountable, competitive bids.

, Approved Changes - ANS-Changes in the agreement files which have been subjected to an
agreed upon change approval process and were accredited by means of the celebration
empowered to approve such adjustments.

As-Built Drawings - ANS-Drawings (plans) that display the paintings as truly mounted. Also
called report drawings.

At-Risk Construction Management - ANS-A transport approach that involves a dedication by the
construction manager to supply the venture for an established amount, often a Guaranteed
Maximum Price (GMP). The creation supervisor acts as a representative to the owner within the
improvement and layout stages. During construction, the CM will anticipate extra obligations
and will undertake construction duties, usually being placed in a felony function similar to that of
a trendy contractor.

Basic Delivery Forms - ANS-1. Traditional Approach or Design-Bid-Build (D-B-B)
2. Multiple-Prime Contracting (Multi-Prime)
three. Construction Management-at-Risk (CM-at-Risk)
4. Design-Build (D-B)
5. Integrated Project Delivery (IPD)

Basic Services - ANS-Scope of service as described in the authentic agreement among the
proprietor and CM as primary services.

Beneficial Occupancy - ANS-The use of the built facility by using the proprietor previous to final
crowning glory of the construction.

Bid - ANS-An offer to perform the work described in agreement documents at a targeted price.

Bid Bond - ANS-A pledge from a surety to pay as much as the bond amount to the owner inside
the event the bidder defaults on its commitment to enter right into a agreement to carry out the
paintings described in the bid documents for the bid rate. The bond is designed to shield the
proprietor for the distinction in fee between the popular bid and the next lowest perfect bid.

Bid Documents - ANS-The documents issued to the contractor(s) with the aid of the owner that
describe the proposed paintings and agreement terms. Bid files usually include drawings,
specs, agreement bureaucracy, general and supplementary widespread situations, thought, or
bid bureaucracy, and other facts.

Biddability - ANS-The degree to which a fixed of bid documents can be fairly predicted to allow
a bidder to establish a aggressive price to carry out the work as defined within the bid files.

Biddability Review - ANS-A formal evaluation of the settlement documents, addendum, and
reference files to be done with recognize to the nearby production market and the bid packaging

Document information

Uploaded on
October 13, 2025
Number of pages
14
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AllLegitExams
3.8
(43)
Sold
126
Followers
8
Items
2337
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions