|\ |\ |\ |\ |\
answers
5S
sort, set in order, shine, standardize, sustain
|\ |\ |\ |\ |\ |\
5 whys
|\
A technique in which you repeatedly ask the question "Why?" to
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
help peel away the layers of symptoms that can lead to the root
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
cause of a problem
|\ |\ |\
Criticality analysis allows organizations to
|\ |\ |\ |\
Identify the most significant risks
|\ |\ |\ |\
Criticality analysis attempts to identify
|\ |\ |\ |\
The likelihood of a risk occurring
|\ |\ |\ |\ |\
,Criteria for criticality analysis may include
|\ |\ |\ |\ |\
Safety, Environmental, and Production consequences
|\ |\ |\ |\
The earliest asset lifecycle phase a criticality analysis may be
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
performed is: |\
During the design phase
|\ |\ |\
The ISO standard that includes criticality analysis is:
|\ |\ |\ |\ |\ |\ |\
ISO14224
Reliability strategy development (RSD) is based on three main
|\ |\ |\ |\ |\ |\ |\ |\ |\
techniques:
RCM, PMO, FMEA|\ |\
RSD relies upon two areas of competence:
|\ |\ |\ |\ |\ |\
,1. Understanding of the differences between RCM, PMO, and
|\ |\ |\ |\ |\ |\ |\ |\ |\
FMEA. 2. Identifying when and where each technique should be
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
applied.
What does RSD stand for?
|\ |\ |\ |\
reliability strategy development |\ |\
There are many forms of RCM, PMO, and FMEA:
|\ |\ |\ |\ |\ |\ |\ |\
All of these derivates help perform analyses cost effectively
|\ |\ |\ |\ |\ |\ |\ |\
Which of the following statements is true regarding FMEA?
|\ |\ |\ |\ |\ |\ |\ |\
1. FMEA helps designers and engineers improve the reliability of
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
assets and systems to produce quality products.
|\ |\ |\ |\ |\ |\
2. FMEA is universally applied to all new assets during the design
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
phase.
|\
3. FMEA governance is defined in the ISO/TS 16949
|\ |\ |\ |\ |\ |\ |\ |\
, FMEA helps designers and engineers improve the reliability of
|\ |\ |\ |\ |\ |\ |\ |\ |\
assets and systems to produce quality products
|\ |\ |\ |\ |\ |\
What does FMEA stand for?
|\ |\ |\ |\
Failure Mode and Effects Analysis
|\ |\ |\ |\
What does RCM stand for?
|\ |\ |\ |\
Reliability Centered Maintenance|\ |\
What does RCA stand for?
|\ |\ |\ |\
Root cause analysis
|\ |\
A preventative/planned maintenance optimization process
|\ |\ |\ |\ |\
focuses on: |\
Evaluating each PM task and eliminating unnecessary tasks or
|\ |\ |\ |\ |\ |\ |\ |\ |\
wasteful activities |\