L Rating - ANSWER-A firestops ability to provide a smoke stop. (air leakage rate)
To avoid damaging cable jacket, how often must you securely fasten electrical
nonmetallic tubing (ENT) - ANSWER-3 Feet so it does not damage the cable
What is the minimum dedicated power requirement of a telecommunications enclosure -
ANSWER-120 V ac/20
The clearance behind the PBB when mounted, should be no less than- - ANSWER-
2inch clearance behind the PBB when mounted
When installing a plywood backboard, you should use galvanized screws that are a
minimum of ______ longer than the depth of the wall covering, including the plywood -
ANSWER-0.5in
The use of under carpet telecommunications cable should be limited to: - ANSWER-The
interconnection point between horizontal cabling and UTC is a transition point (TP)
Two 90-degree bends are allowed in any one conduit segment. A third bend may be
acceptable under certain situations - ANSWER-Runs under 33 feet
When installing racks and cabinets on an access floor, what should they be secured to?
- ANSWER-The frame
When placing cabinets on an access floor, how should the cabinets be aligned? -
ANSWER-One edge flush with the floor tile cut line
, What is a telecommunications enclosure TE used for? - ANSWER-May be used to
provide a suitable option for moves, adds, and changes without compromising infection
control measures and other restrictions
What size threaded rod would you typically use in a heavy duty ladder rack installation?
- ANSWER-5/8in
A supplemental bonding network within an ER or data center consisting of a set of
conductors formed into a grid is often associated with what? - ANSWER-Access flooring
Which type of anchor requires a hole to be drilled into the floor where the attachment is
to be made? - ANSWER-Expansion anchors
Min seperation from electric motors and transformers? - ANSWER-48"
During which phase of the project would you determine cable labeling requirements? -
ANSWER-Pre-construction Phase
What type of documentation uses the original floor plans and reflects the actual installed
outlet locations, cables, length, and firestopping materials? - ANSWER-Record
drawings
Which project document is used to request clarification, supplemental information, or
approval of material substitutions? - ANSWER-RFI
Comparing design documents to existing conditions, verifying parking access, and
determining the work hours are all examples of what you would learn during -
ANSWER-A job start
T1 - ANSWER-Layout of complete building per floor; serving zone boundaries,
backbone distribution systems, and horizontal pathways
Questions With Correct Answers 2025/2026
L Rating - ANSWER-A firestops ability to provide a smoke stop. (air leakage rate)
To avoid damaging cable jacket, how often must you securely fasten electrical
nonmetallic tubing (ENT) - ANSWER-3 Feet so it does not damage the cable
What is the minimum dedicated power requirement of a telecommunications enclosure -
ANSWER-120 V ac/20
The clearance behind the PBB when mounted, should be no less than- - ANSWER-
2inch clearance behind the PBB when mounted
When installing a plywood backboard, you should use galvanized screws that are a
minimum of ______ longer than the depth of the wall covering, including the plywood -
ANSWER-0.5in
The use of under carpet telecommunications cable should be limited to: - ANSWER-The
interconnection point between horizontal cabling and UTC is a transition point (TP)
Two 90-degree bends are allowed in any one conduit segment. A third bend may be
acceptable under certain situations - ANSWER-Runs under 33 feet
When installing racks and cabinets on an access floor, what should they be secured to?
- ANSWER-The frame
When placing cabinets on an access floor, how should the cabinets be aligned? -
ANSWER-One edge flush with the floor tile cut line
, What is a telecommunications enclosure TE used for? - ANSWER-May be used to
provide a suitable option for moves, adds, and changes without compromising infection
control measures and other restrictions
What size threaded rod would you typically use in a heavy duty ladder rack installation?
- ANSWER-5/8in
A supplemental bonding network within an ER or data center consisting of a set of
conductors formed into a grid is often associated with what? - ANSWER-Access flooring
Which type of anchor requires a hole to be drilled into the floor where the attachment is
to be made? - ANSWER-Expansion anchors
Min seperation from electric motors and transformers? - ANSWER-48"
During which phase of the project would you determine cable labeling requirements? -
ANSWER-Pre-construction Phase
What type of documentation uses the original floor plans and reflects the actual installed
outlet locations, cables, length, and firestopping materials? - ANSWER-Record
drawings
Which project document is used to request clarification, supplemental information, or
approval of material substitutions? - ANSWER-RFI
Comparing design documents to existing conditions, verifying parking access, and
determining the work hours are all examples of what you would learn during -
ANSWER-A job start
T1 - ANSWER-Layout of complete building per floor; serving zone boundaries,
backbone distribution systems, and horizontal pathways