• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 15 pages
Exam (elaborations)

Chapter 16 ISDS 3115 Questions with Detailed Verified Answers

Document preview thumbnail
Preview 2 out of 15 pages

Chapter 16 ISDS 3115 Questions with Detailed Verified Answers

Content preview

Click here for more: Scholars nexus


Chapter 16 ISDS 3115 Questions with Detailed Verified
Answers



What does TPS stand for?

a. Total Production Streamlining

b. Toyota Production System

c. Taguchi's Production S's

d. Total Process Simplification

e. None of the above Ans: ✓ ✓ ✓ B

Which of the following is generally found in most JIT environments?

a. a push or pull system, depending upon the rate of demand

b. a push system for high margin items and a pull system for low margin items

c. a push system for purchased parts and a pull system for manufactured parts

d. push systems

e. pull systems Ans: ✓ ✓ ✓ E

Which one of the following is not a benefit of the implementation of JIT?

a. cost reduction

b. variability increase

c. rapid throughput

d. quality improvement


© Get it right 2025 Getaway - Stuvia US All rights reserved

, Click here for more: Scholars nexus
e. rework reduction Ans: ✓ ✓ ✓ B

Which of the following is not a reason for variability?

a. Employees, machines, and suppliers produce units late.

b. Customer demand is unknown.

c. Employees, machines, and suppliers produce units that conform to standards.

d. Engineering drawings are inaccurate.

e. Drawings or specifications are incomplete. Ans: ✓ ✓ ✓ C

Which of the following is specifically characterized by a focus on continuous improvement, respect
for people, and standard work practices?

a. Just-in-time (JIT)

b. Toyota Production System (TPS)

c. Lean operations

d. Material requirements planning (MRP)

e. kanban Ans: ✓ ✓ ✓ B

Which of the following is specifically characterized by continuous and forced problem solving via a
focus on throughput and reduced inventory?

a. Just-in-time (JIT)

b. Toyota Production System (TPS)

c. Lean operations

d. Material requirements planning (MRP)

e. kanban Ans: ✓ ✓ ✓ A

Which of the following statements regarding a pull system is true?

a. Large lots are pulled from upstream stations.

© Get it right 2025 Getaway - Stuvia US All rights reserved

Document information

Uploaded on
October 9, 2025
Number of pages
15
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Novalearn
3.6
(7)
Sold
27
Followers
0
Items
5280
Last sold
8 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions