Low Pressure Boiler COF NY
Comprehensive Questions with
Verified Answers Graded A+
A fill line in an oil burner system is a line used to: - Answer: Fill the storage tank with oil.
The aquastat is located - Answer: Below the water line.
All heating, combustion, and cooking equipment shall be installed with adequate clearances
from _______ construction. - Answer: Combustible
The equipment must be provided with ______ or the building construction shall be _____
_____. - Answer: Insulation.
Fire Protected
During operation the surface of combustible construction materials will not be raised to a temp
higher than _____ degrees F. - Answer: 170 degrees
Equipment shall be so that the means of access for ordinary operation and maintenance will not
be _______. - Answer: Hazardous
Acceptance Tests:
Boilers shall not be placed in operation until they have been _____ and ____ and an equipment
____ _____ has been issued by the ______. - Answer: Inspected and tested.
, Use permit, commissioner
Periodic Inspections: All boilers must be inspected at least _____ a _____ including chimney
connections. - Answer: Once a year
Owners Annual Statement: The owner of each boiler shall file an _____ written statement with
the ________, specifying the _____of each boiler and ______ for inspection. - Answer: Annual,
commissioner, location, arrangement.
Field Tests: all piping and oil storage tanks shall be _______ tested for tightness by the ______
before the system is operated. - Answer: Hydrostatically, contractor
The piping shall be tested at _____ times the max working pressure applicable to that part of
the piping system but at a pressure ____ than the test pressure required for the storage tank. -
Answer: 1/2, less
The min pressure for testing tanks shall be ____ times the max working pressure but in no case
less than ____ psi. - Answer: 1 1/2, 25 psi
The hydrostatic pressure must be maintained until all ____ and _____ have been visually
inspected for ___, but in no case less than _____ hour. - Answer: Joints, connections, leaks, 1/2
hour.
A record must be kept of the pressure test showing the name of the _____ and the _____ at
which the piping and tank were tested. - Answer: Contractor, pressure
Gas piping must be tested by the _____ before operation. - Answer: Contractor
Comprehensive Questions with
Verified Answers Graded A+
A fill line in an oil burner system is a line used to: - Answer: Fill the storage tank with oil.
The aquastat is located - Answer: Below the water line.
All heating, combustion, and cooking equipment shall be installed with adequate clearances
from _______ construction. - Answer: Combustible
The equipment must be provided with ______ or the building construction shall be _____
_____. - Answer: Insulation.
Fire Protected
During operation the surface of combustible construction materials will not be raised to a temp
higher than _____ degrees F. - Answer: 170 degrees
Equipment shall be so that the means of access for ordinary operation and maintenance will not
be _______. - Answer: Hazardous
Acceptance Tests:
Boilers shall not be placed in operation until they have been _____ and ____ and an equipment
____ _____ has been issued by the ______. - Answer: Inspected and tested.
, Use permit, commissioner
Periodic Inspections: All boilers must be inspected at least _____ a _____ including chimney
connections. - Answer: Once a year
Owners Annual Statement: The owner of each boiler shall file an _____ written statement with
the ________, specifying the _____of each boiler and ______ for inspection. - Answer: Annual,
commissioner, location, arrangement.
Field Tests: all piping and oil storage tanks shall be _______ tested for tightness by the ______
before the system is operated. - Answer: Hydrostatically, contractor
The piping shall be tested at _____ times the max working pressure applicable to that part of
the piping system but at a pressure ____ than the test pressure required for the storage tank. -
Answer: 1/2, less
The min pressure for testing tanks shall be ____ times the max working pressure but in no case
less than ____ psi. - Answer: 1 1/2, 25 psi
The hydrostatic pressure must be maintained until all ____ and _____ have been visually
inspected for ___, but in no case less than _____ hour. - Answer: Joints, connections, leaks, 1/2
hour.
A record must be kept of the pressure test showing the name of the _____ and the _____ at
which the piping and tank were tested. - Answer: Contractor, pressure
Gas piping must be tested by the _____ before operation. - Answer: Contractor