100, preheaters, 180
Choose an answer
1 A fill line in an oil burner system is a line used to:
The hydrostatic pressure must be maintained until all ____ and _____ have been visually
2
inspected for ___, but in no case less than _____ hour.
During operation the surface of combustible construction materials will not be raised
3
to a temp higher than _____ degrees F.
, The storage temp range for oil is about ____degrees F. The use of _____ help it to be
4 pumped to the oil burning unit. The fuel oil is raised to about ____ degrees before it
enters the combustion process.
Don't know?
Terms in this set (103)
A fill line in an oil burner Fill the storage tank with oil.
system is a line used to:
The aquastat is located Below the water line.
All heating, combustion, Combustible
and cooking equipment
shall be installed with
adequate clearances from
_______ construction.
The equipment must be Insulation.
provided with ______ or the Fire Protected
building construction shall
be _____ _____.
During operation the 170 degrees
surface of combustible
construction materials will
not be raised to a temp
higher than _____ degrees F.
Equipment shall be so that Hazardous
the means of access for
ordinary operation and
maintenance will not be
_______.
, Acceptance Tests: Inspected and tested.
Boilers shall not be placed Use permit, commissioner
in operation until they
have been _____ and ____
and an equipment ____ _____
has been issued by the
______.
Periodic Inspections: All Once a year
boilers must be inspected
at least _____ a _____
including chimney
connections.
Owners Annual Statement: Annual, commissioner, location, arrangement.
The owner of each boiler
shall file an _____ written
statement with the ________,
specifying the _____of each
boiler and ______ for
inspection.
Field Tests: all piping and Hydrostatically, contractor
oil storage tanks shall be
_______ tested for tightness
by the ______ before the
system is operated.
The piping shall be tested 1/2, less
at _____ times the max
working pressure
applicable to that part of
the piping system but at a
pressure ____ than the test
pressure required for the
storage tank.