The ______ consists of daily checks of the work to assure continuing compliance with
contract requirements - Answer -Follow-up phase
Design-Build contracts require: - Answer -*The QC Manager to be in place and take an
active role in the review and coordination of the design*
Which of the following is included in all three phases of the Three Phases of Control -
Answer -Safety
The purpose of Construction Quality Management is to - Answer -*Achieve the quality
established by properly developed requirements through the combined responsibility,
but separate, efforts of contractor and Government personnel*
Testing is extremely important in Construction Quality Management and is performed by
- Answer -Both the contractor and the Government
The primary purpose of the Three-Phase Control System is to: - Answer -Require the
contractor to plan, schedule, and perform quality management actions to assure work
meets all specified quality standards
Quality Assurance Personnel have the responsibility to: - Answer -*require the
contractor to maintain the quality specified in the plans and specifications*
the ____ is the appropriate time to assure that all materials and/or equipment have
been tested. submitted, and approved. - Answer -Preparatory Phase
The Preconstruction Conference and the Coordination and Mutual Understanding
Meeting are: - Answer -conducted prior to the commencement of any physical
construction work
Contractor testing procedures: - Answer -are specified in the technical specifications,
outlined in the Quality Control Plan, and addressed at the Coordination and Mutual
Understanding Meeting.
The Quality Control Plan contains: - Answer -Identification of individual quality control
personnel, including name, qualifications, assigned duties, responsibilities and
authorities
Tests that are unnanounced, randomly performed, and repeat quality control tests are: -
Answer -quality assurance tests
The ______ consists of daily checks of the work to assure continuing compliance with
contract requirements - Answer -Follow-up phase
Design-Build contracts require: - Answer -*The QC Manager to be in place and take an
active role in the review and coordination of the design*
Which of the following is included in all three phases of the Three Phases of Control -
Answer -Safety
The purpose of Construction Quality Management is to - Answer -*Achieve the quality
established by properly developed requirements through the combined responsibility,
but separate, efforts of contractor and Government personnel*
Testing is extremely important in Construction Quality Management and is performed by
- Answer -Both the contractor and the Government
The primary purpose of the Three-Phase Control System is to: - Answer -Require the
contractor to plan, schedule, and perform quality management actions to assure work
meets all specified quality standards
Quality Assurance Personnel have the responsibility to: - Answer -*require the
contractor to maintain the quality specified in the plans and specifications*
the ____ is the appropriate time to assure that all materials and/or equipment have
been tested. submitted, and approved. - Answer -Preparatory Phase
The Preconstruction Conference and the Coordination and Mutual Understanding
Meeting are: - Answer -conducted prior to the commencement of any physical
construction work
Contractor testing procedures: - Answer -are specified in the technical specifications,
outlined in the Quality Control Plan, and addressed at the Coordination and Mutual
Understanding Meeting.
The Quality Control Plan contains: - Answer -Identification of individual quality control
personnel, including name, qualifications, assigned duties, responsibilities and
authorities
Tests that are unnanounced, randomly performed, and repeat quality control tests are: -
Answer -quality assurance tests