VA DEQ ESC Inspector Exam Questions and Answers (Most Recent Version, Complete Study Material

Document preview thumbnail
Preview 4 out of 48 pages

VA DEQ ESC Inspector Exam Questions and Answers (Most Recent Version, Complete Study Material

Content preview

VA DEQ ESC Inspector Exam Questions
and Answers (Most Recent Version,
Complete Study Material)
VESCP - Correct Answers ✅Virginia Erosion and Sediment
Control Program


- Administered by counties/cities (must), towns (may)
- MUST BE APPROVED


Minimum Standard 1 - Correct Answers ✅Stabilization


permanent or temporary soil stabilization shall be applied to
denuded areas within seven days after final grade is reached
on any portion of the site; temporary soil stabilization shall be
applied within seven days to denuded areas that may not be
at final grade but will remain dormant for longer than 14
days; permanent stabilization shall be applied to areas that
are to be left dormant for more than one year


Site NOT at Final Grade - Correct Answers ✅- stabilize in 14
days
- temporarily seed
- mulch
- permanently stabilize if dormant > 1 year


Site at Final Grade - Correct Answers ✅- stabilize in 7 days
(recommended immediately)

,VA DEQ ESC Inspector Exam Questions
and Answers (Most Recent Version,
Complete Study Material)
- permanently or temporarily seed and mulch
- mulch/matting/straw


Minimum Standard 2 - Correct Answers ✅Stock Piles,
Waste and Borrow Areas


during construction, soil stock piles and borrow areas shall be
stabilized or protected with sediment trapping measures


mulch prevents erosion by protecting the surface from
raindrop impact and silt fence intercepts and detains from
disturbed areas


Minimum Standard 3 - Correct Answers ✅Permanent
Vegetation


permanent vegetation cover shall be established on denuded
areas not otherwise permanently stabilized (permanent
vegetation shall not be considered established until a ground
cover is achieved that is uniform, mature enough to survive,
and will inhibit erosion *there is no % associated with this*)


reduce erosion and decrease sediment yield from disturbed
area

,VA DEQ ESC Inspector Exam Questions
and Answers (Most Recent Version,
Complete Study Material)
this is the standard used to verify that a site is ready for
release of bonds or surety


Minimum Standard 4 - Correct Answers ✅First-Step
Measures


Sediment basins and traps, perimeter dikes, sediment
barriers and other measures intended to trap sediment shall
be constructed as a first step in any land-disturbing activity
and shall be made functional before upslope land disturbance
takes place


a certain amount of initial land disturbance may be required
to provide access for equipment to install the perimeter
controls, but site clearing and grading should be kept to a
minimum until the perimeter controls are in place


intercepts and detains small amounts of sediment from
disturbed areas during construction operation to prevent
sediment from leaving the site and decrease velocity of sheet
flows and low-to-moderate level channel flow


Perimeter Controls - Correct Answers ✅assures that
sediment does not leave the perimeter of the land-disturbing
area once site clearing, grading, and construction
commences

, VA DEQ ESC Inspector Exam Questions
and Answers (Most Recent Version,
Complete Study Material)

Examples: silt fences, sediment traps, sediment basins,
construction entrance, temporary diversions, diversions


Minimum Standard 5 - Correct Answers ✅Earthen
Structure Stabilization


stabilization measures shall be applied to earthen structures
such as dams, dikes, and diversions immediately after
installation


reduce erosion and sedimentation and reduce damage from
sediment and runoff to downstream or off-site areas


Minimum Standard 6 - Correct Answers ✅Traps and Basins


sediment traps and basins shall be designed and constructed
based upon the total drainage area (not just disturbed area)
to be served by the trap or basin


Sediment Traps - Correct Answers ✅minimum storage
capacity shall be 134 cubic yards per acre of drainage area
and shall only control drainage areas less than 3 acres

Document information

Uploaded on
October 6, 2025
Number of pages
48
Written in
2025/2026
Type
Exam (elaborations)
Contains
Unknown
$16.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Allivia
3.9
(153)
Sold
805
Followers
400
Items
16561
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions