Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

SAFe Training for RTE Exam Questions and Answers 100% Pass | Verified and Updated

Document preview thumbnail
Preview 2 out of 5 pages

SAFe Training for RTE Exam Questions and Answers 100% Pass | Verified and Updated

Content preview

SAFe Training for RTE
Study online at https://quizlet.com/_hurdgf

1. SAFe: Scaled Agile Framework for Enterprises
2. RTE: Release Train Engineer
3. RTE Responsibilities: 1. Managing and optimizing the flow of value through the ART
2. Fostering collaboration between teams and system-level stakeholders
3. Facilitating PI Planning readiness and the event itself
4. Tracking and communicating key ART execution metrics
5. Escalating and tracking ART impediments
6. Facilitate relentless improvement for the ART
7. Coach leaders, teams, and Scrum Masters in Lean-Agile practices and the Lean-Agile Mindset
8. Facilitate Program Kanban Feature development
4. Agile Release Train (ART): A long-lived and cross-functional team-of-Agile-teams, which along with other
stakeholders, develops and delivers solutions incrementally, using a series of fixed-length Iterations within a Program
Increment (PI) timebox. Aligns teams to a common business and technology mission.
5. SAFe Core Values: - Alignment
- Transparency
- Built-in Quality
- Program Execution
6. Describe the flow of value through the SAFe configurations: The Continuous Delivery
Pipeline represents the flow of value from concept to delivery
7. SAFe Lean-Agile Principles (9 total): 1 - Take an economic view
2 - Apply Systems Thinking
3 - Assume variability; preserve options
4 - Build incrementally with fast, integrated learning cycles
5 - Base milestones on objective evaluation of working systems
6 - Visualize and limit WIP, reduce batch sizes, and manage queue lengths
7 - Apply cadence, synchronize with cross-domain planning
8 - Unlock the intrinsic motivation of knowledge workers
9 - Decentralize decision-making
8. Without a shared understanding of priciples: - There is no systematic way to adapt practices
to local context
- Business outcomes do not significantly improve
- Practices and measures that were once beneficial become problematic
1/5

, SAFe Training for RTE
Study online at https://quizlet.com/_hurdgf

- Lean-Agile Mindset is unachievable
- Conflict and disagreement on processes and practices are difficult to resolve.
9. Attributes of an effective ART organization: ART consists of 5-12 virtual teams (total of 50-125
individuals) that are organized around a flow of value and that plan, commit, and execute together
10. Dunbar's number: suggested cognitive limit to the number of people with whom one can maintain stable
social relationships
11. Product Manager: Owns, defines, and prioritizes the Program Backlog
12. ART leadership: System Arch/Eng
Product Mgmt
RTE
13. Product Manager Primary Responsibilities: 1. Understanding the customer needs; and vali-
date solutions
2. working with system architect/engineering to understand the value of enablers
3. developing and communicating ART Vision and roadmap
4. managing and prioritizing the flow of work to the ART
5. preparing for and participating in the PI Planning
6. Participating in demos and Inspect and Adapt
7. Building and effective Product Manager/Product Owner team
14. System Architect Responsibilities: 1. Working with teams on the ART to define subsystems and
their interfaces
2. establishing critical NFRs at the solution level; participate in the definition of others
3. defining, exploring, and supporting the implementation of enablers
4. planning and developing the architectural runway
5. working with PM to determine capacity allocation
6. supervising and fostering built-in quality
15. Business Owner Responsibilities: 1. Ensure that business objectives are comprehended and
agreed to by key stakeholders of the train
2. Play a primary role in PI Planning activities and assign Business Value to Objectives
3. Watch for external commitments and dependencies
4. Attend the system and/or solution demo to view progress and provide feedback
5. Help drive investment to the continuous delivery pipeline
6. help align a devOps culture of shared responsibilities
2/5

Document information

Uploaded on
October 5, 2025
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SophiaBennett
3.6
(29)
Sold
155
Followers
5
Items
9092
Last sold
3 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions