WEIGHT OF CONCRETE - CORRECT ANSWER-150 LB/CF
CONSTRUCTION DELIVER METHODS - CORRECT ANSWER-1) DESIGN-BID-
BUILD
2) CONSTRUCTION MANAGEMENT
3) DESIGN-BUILD (DB)
4) INTEGRATED PROJECT DELIVERY(IPD)
TYPICAL DESIGN INCLUDES - CORRECT ANSWER-1) SPECIFICATIONS
2) CONSTRUCTION DRAWINGS
TYPES OF CONSTRUCTION DRAWINGS - CORRECT ANSWER-1) CIVIL
2) STRUCTURAL (S1.0)
3) ARCHITECTURAL (A1.0)
4) PLUMBING (P1.0)
5) MECHANICAL (M1.0)
6) FIRE PROTECTION (F.P.1.0)
7) ELECTRICAL (E1.0)
DIVISION 3 - CORRECT ANSWER-CONCRETE
TYPICAL DESIGN PROCESS - CORRECT ANSWER-OWNER - DESIGN PHASE -
BIDDING
DESIGN PHASE - CORRECT ANSWER-6-8 MONTHS, DEVELOP DOCUMENTS
BIDDING PHASE - CORRECT ANSWER-"TAKEOFF" 2-3 WEEKS
VALUE ENGINEERING - CORRECT ANSWER-1) MONEY
2) SIZE
3) QUANTITY
(1-6 WEEKS)
O.C.E.W. - CORRECT ANSWER-ON CENTER EACH WAY
WHO VOTES ON BUILDING CODES/MANUALS? - CORRECT ANSWER-
CITY/COUNTY
UNIFORM BUILDING CODE - CORRECT ANSWER-UBC
INTERNATIONAL BUILDING CODE - CORRECT ANSWER-IBC