DBIA: Definitions


IDWP - Answer-Integrated Design Work Plan



PDRI - Answer-Project Definition Rating Index



What is the biggest item contributing to team failure? - Answer-Absence of trust



Design manager - Answer-Manages design information flow and deliverables. Unique role that didn't
exist before



Designer of record - Answer-The member of the Design-Builder's team responsible for stamping and
sealing the design documents.



Four primary phases of project oversight - Answer-Preconstruction, contract oversight, close-out, and
performance evaluation



Formal partnering typically results in mutually developing which items? - Answer-A charter,
communication matrix, and an issue resolution ladder



What are the critical interfaces between designer of record and contractor? - Answer-Design &
construct for value, design & construct to budget, design for constructability, and design& construct for
quality performance



Three types of Owner Specifications/Requirements - Answer-Prescriptive, Functional and Performance

,Offer - Answer-1 of 3 requirements for a legal contract. Party offers to contract with another. (response
to RFP)



Acceptance - Answer-1 of 3 requirements for a legal contract. A party accepts the other party's offer



Consideration - Answer-1 of 3 requirements for a legal contract. Value exchanged for performance
(Payment, money, services, etc.)



Capacity - Answer-The party making the contract must be legally able to do so



Authority - Answer-The individual forming the contract must have authority to do so



Betterment Doctrine - Answer-Avoids windfalls- owner must pay first cost



Constructive change - Answer-Change by implication-can be oral or written or omission (a forced
change)



Indemnity - Answer-Generally, security or protection against liability, loss, damage or financial burden.
Insurance portion ie. for 3rd party claims



Liquidated Damages - Answer-Cost of late completion- NOT a penalty



Spearin Doctrine - Answer-D-B-B. Owner is required to provide Contractor with plans that are buildable.
If contractor builds in compliance whether or not it works then contractor is not held responsible



Tort Law - Answer-Tort law governs the remedies for civil wrongs. A person is liable for the wrongful act,
whether done accidentally or intentionally. The injured or the aggrieved party is compensated by the
payment for damages

, Contract Law - Answer-Law between two parties. An agreement between private parties creating
mutual obligations enforceable by law. The basic elements required for the agreement to be a legally
enforceable contract are: mutual assent, expressed by a valid offer and acceptance; adequate
consideration; capacity; and legality.



Differing Site Conditions Type 1 - Answer-Unknown & hidden, concealed, or latent physical condition
(ex. geotechnical report incorrect)



Differing Site Conditions Type 2 - Answer-Encounters unknown physical conditions of unusual nature
that differ materially from those ordinarily encountered & generally recognized as inherent in the work
at the Project's location



Define GMP - Answer-Guaranteed Maximum price provided by Contractor to Owner



Bridging documents - Answer-Example would be Owner supplying preliminary design documents- they
may be subject to errors/omissions putting owner at risk to be dealing with Spearin Doctrine



Perscriptive Specification - Answer-Owner dictates exactly how an element is to be designed and
constructed



What is CGL insurance? - Answer-Commercial General Liability- insurance limited to specific events; risk
of liability to third parties, bodily injury/property damages, and completed operations are covered risks



Builder's Risk Policy - Answer-Coverage that protects insurable interest in materials, fixtures, &
equipment being used in constructions should those items sustain physical loss or damaged from a
covered cause.



What are the four primary phases of oversight? - Answer-Pre-Construction, contract oversight, close-
out, and performance evaluations

Document information

Uploaded on
October 3, 2025
Number of pages
19
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$25.09

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Zanaya
4.5
(12)
Sold
77
Followers
29
Items
10176
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions