100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Naslca Virginia

Rating
-
Sold
-
Pages
14
Grade
A+
Uploaded on
01-10-2025
Written in
2025/2026

Exam of 14 pages for the course Naslca Virginia at Naslca Virginia (Naslca Virginia)

Institution
Naslca Virginia
Course
Naslca Virginia









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Naslca Virginia
Course
Naslca Virginia

Document information

Uploaded on
October 1, 2025
Number of pages
14
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

NASLCA VIRGINIA EXAM PRACTICE
COMPLETE QUESTIONS AND
ANSWERS
What is the MAXIMUM penalty for a contractor who undertakes work without the proper
class of license? -ANS$500 fine per day for each day of violation plus penalties for a
misdemeanor.

All Class A contractor licensure applications MUST include -ANSinformation on the
knowledge, skills, and abilities of the applicant.

What is the PRIMARY purpose of licensing? -ANSProtect the health and welfare of the
public.

When a claimant is paid funds from the Contractors Recovery Trust Fund -ANSthe
contractor's license is revoked. !!!

The application for licensure MUST include -ANSthe business address of the proposed
designated employee.

Which of the following is a requirement for a joint venture? -ANSEither the joint venture
or each contracting party of the joint venture must be licensed.

All of the following must be licensed EXCEPT -ANSa material supplier who advises a
contractor.

How much is the Class A initial license fee? -ANS$200

A licensee's name change MUST be reported to the Board within a MAXIMUM of how
many days? -ANS30 days

According to the Board Rules and Regulations, a full-time employee is one who works a
MINIMUM of how many hours per week? -ANS30 hours.

A firm desiring to be licensed as a Class B contractor MUST have a MINIMUM net
worth of -ANS$15,000.

According to the Board Rules and Regulations, which of the following could be a
qualified individual? -ANSAny full-time employee.

, An appeal of the local building official's decision to refuse to grant a modification to the
USBC MUST be made to the local building board within a MAXIMUM of how many
days? -ANS90 days.

A building official MUST issue a certificate of occupancy for a building that meets all the
requirements for a certificate within a MAXIMUM of how many working days after the
certificate was requested? -ANS5

Additions to buildings MUST comply with -ANSthe current code for new construction.

When MUST the work be stopped following the issuance of a stop work order? -
ANSImmediately

Who is to be in charge of a local building department? -ANSBuilding official.

Contractors who are assessed a fee to support the Transaction Recovery Fund MUST
pay this fee within a MINIMUM of how many days from when the assessment fee notice
was mailed? -ANS45 days

Contractors will be assessed a fee for the Transaction Recovery Fund whenever the
fund balance is less than -ANS$400,000.

Payments made by the Transaction Recovery Fund to claimants may include an
amount for -ANSattorneys' fees.

A contract for which of the following types of structures may be subject to recovery from
the Transaction Recovery Fund? -ANSResidential only.

A verified claim for payment from the Transaction Recovery Fund MUST occur within a
MAXIMUM of what period of time from the date the claimant was awarded a final
judgment? -ANS12 months.

An appeal of a final decision of a county on an erosion control plan MUST be filed within
a MAXIMUM of how many days? -ANS30 days.

Temporary erosion and sediment control measures MUST be removed within a
MAXIMUM of how many days after the final site stabilization? -ANS30 days.

Which of the following statements about a sole proprietorship is TRUE? -ANSThe
business, or any part of it, can be sold, altered, or exchanged at will.

What type of business organization allows people to share financial resources? -
ANSPartnership.

Which of the following estimating methods is typically used by the architect rather than
the contractor? -ANSConceptual estimate.
$15.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
annn15671

Get to know the seller

Seller avatar
annn15671 Chamberlain College Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
7 months
Number of followers
0
Documents
846
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions