CQM-C UPDATED ACTUAL Questions and CORRECT Answers
Achieve the quality established by properly developed
The purpose of Construction Quality Management is to: requirements through the combined responsibility, but
seperate efforts of contractpr smd government personnel.
Construction Quality Management is the performance of According to plans and specifications, on time, within a
tasks, which ensure that construction is performed. defined budget and a safe work environment.
Partnering relationships are based upon: Building trust and dedication to common goals
Periodically verify that the contractors system of control is
It is the responsibility of Quality Assurance Personnel to:
working effectively.
Be an incentive for work to be done correctly the first time
An effective contractor quality control program will: resulting in earlier completion, reduced field overhead
costs, and greater profits.
The ability to control costs, finance work, estimate jobs,
The success or failure of all contractors is based upon:
schedule the work, and maintain effective quality control.
Require contractors to maintain the quality specified in the
Quality Assurance Personnel have the responsibility to:
plans and specifications.
The process by which ongoing and completed work is
Inspection is:
examined
Quality Assurance Personnel must assure that the contrac-
During the punch-out inspection of a project:
tor prepares a punch-list and makes corrections.
If there is a disagreement whether the contractors work
The government makes the final determination
complies with the contract:
Cross-referenced listings to the contractors construction
Characteristics that describe a definable feature of work
schedule that may have more than one definable feature
include:
under a section of the specifications.
The consists of daily checks of
the work to assure continuing compliance with contract Follow-up phase
requirements.
Achieve the quality established by properly developed
The purpose of Construction Quality Management is to: requirements through the combined responsibility, but
seperate efforts of contractpr smd government personnel.
Construction Quality Management is the performance of According to plans and specifications, on time, within a
tasks, which ensure that construction is performed. defined budget and a safe work environment.
Partnering relationships are based upon: Building trust and dedication to common goals
Periodically verify that the contractors system of control is
It is the responsibility of Quality Assurance Personnel to:
working effectively.
Be an incentive for work to be done correctly the first time
An effective contractor quality control program will: resulting in earlier completion, reduced field overhead
costs, and greater profits.
The ability to control costs, finance work, estimate jobs,
The success or failure of all contractors is based upon:
schedule the work, and maintain effective quality control.
Require contractors to maintain the quality specified in the
Quality Assurance Personnel have the responsibility to:
plans and specifications.
The process by which ongoing and completed work is
Inspection is:
examined
Quality Assurance Personnel must assure that the contrac-
During the punch-out inspection of a project:
tor prepares a punch-list and makes corrections.
If there is a disagreement whether the contractors work
The government makes the final determination
complies with the contract:
Cross-referenced listings to the contractors construction
Characteristics that describe a definable feature of work
schedule that may have more than one definable feature
include:
under a section of the specifications.
The consists of daily checks of
the work to assure continuing compliance with contract Follow-up phase
requirements.