• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

Physical Security (Test)/PCS Test guide with complete solution latest update

Document preview thumbnail
Preview 2 out of 9 pages

Physical Security (Test)/PCS Test guide with complete solution latest update

Content preview

Physical Security (Test)/PCS Test guide
with complete solution latest update

D-Ring - ANS What is required on an OSHA approved harness for fall protection

6" or greater - ANS Openings _______ or greater at stairways, walkways, and open decks
must be guarded/covered

6' or above - ANS All window, door, and access openings _____ or above grade must be
guarded

2x4 or better - ANS Window and door guards must be ______

19.2" OC with 18" opening OR 24" OC with 2 rows of blocking & 3-1/2" toe kick - ANS For
clear story framing, stud bay spacing is not to exceed _______ OC with _____ opening OR
_______ OC with ____ rows of blocking and _____ toe kick

10ft or higher - ANS Working platforms have guardrails when _______ or higher

Planked - ANS Working platforms on scaffolds and decks are fully ______

At least 6", not more than 12" - ANS Scaffold planks are to be overlapped at least ___ but not
more than ___

Curb to curb - ANS ____ to ____ hard hat policy on all active construction sites

Eye protection - ANS ____________ must be worn when cutting, sawing, using nail guns,
mixing stucco or mortar, etc

N95 mask/respirator - ANS To be worn while cutting/ripping cement type siding, mixing stucco
or gypsum mortar or when working with any products that contains silica or other harmful
particles

3ft above roofline, 10ft tied off - ANS Ladders must extend ____ft above roof line and ladders
above ____ft must be tied off

Storm Water Pollution Prevention Plan - ANS What does SWPPP stand for?

True - ANS Containment is required under gasoline powered equipment

3000 PSI - ANS Minimum concrete PSI needed is...

, Concrete is placed in a continuous pour for monolithic slabs and walls - ANS True

1 gallon per cubic yard - ANS Water added on site is no more than ___ gallon(s) per cubic yard

90 minutes - ANS Concrete is discharged within ____ minutes after introduction of water to
cement

12 inches - ANS All exterior footings shall be placed at least ____ inches below the
undisturbed soil unless otherwise specified by EOR

1/4 thickness, 10ft intervals, 24 hours - ANS All non-post tensioned slabs have control joints
cut or tooled _____ thickness of the slab at _____ intervals within _____ hours of placement

2 or more - ANS Expansion joint in flatworm when the concrete slab is confined on ____ or
more sides

False - ANS Vegetative growth is allowed on pad area where concrete is poured

Sheathing or Wrapping - ANS Pipes passing through concrete are protected with _____ or
_____ that allows for movement including expansion and contraction of piping. Wall thickness
not less than 0.025 inch

Pipe Sleeve, 2 pipe sizes - ANS Pipes passing through a foundation wall shall be provided with
a _____ ______ that shall be built into the foundation wall. It shall be ____ pipe sizes greater
than the pipe passing through the wall

Backfilled & compacted - ANS All plumbing, electrical, and chases have been ______ and
_____ in accordance with soils report

Below the slab - ANS All conduits should be placed _____ the ______ as to not impact the
thickness of the slab

4" - ANS The slab depth is

2 rebar 24" OC - ANS What is placed diagonally over re-entrant corners

8" - ANS Overlap of wire mesh is 2 squares which is measured as ...

1/8" - ANS What is the gap size between all OSB sheathing?

16" OC - ANS Furring strip spacing at all tub and shower walls is...

Document information

Uploaded on
September 25, 2025
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
CUTENURSE1
4.7
(20)
Sold
124
Followers
30
Items
2390
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions