• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

NC Water & Sewer - Erosion and Sedimentation Control Exam Q’s and A’s

Document preview thumbnail
Preview 2 out of 5 pages

NC Water & Sewer - Erosion and Sedimentation Control Exam Q’s and A’s

Content preview

NC Water & Sewer - Erosion and Sedimentation
Control Exam Q’s and A’s
1 - Which of the below would require an approved erosion and sedimentation control plan
before any clearing or grading may occur?

1 - Less than ½ acre
2 - Over ½ acre
3 - 1 acre
4 - Over 1 acre - -Over 1 acre

-2 - Erosion and sedimentation control plans must be submitted how many days in
advance of the start of clearing or grading?

1 - 7 days
2 - 14 days
3 - 30 days
4 - 90 days - -30 days

-3 - Which of the below are true about erosion and sedimentation control?

1 - Surfaces must be stabilized
2 - Sediment must be retained on site
3 - Don't start work before plan approval
4 - All of these - -All of these

-4 - Who is responsible for erosion control?

1 - EPA
2 - NC Erosion Control Agency
3 - Local Government
4 - Person financially responsible for land disturbing activity - -Person financially
responsible for land disturbing activity

-5 - In addition to the person financially responsible for the land disturbing activity who
else may be held responsible for erosion control?

1 - The contractor
2 - The grading contractor
3 - EPA
4 - The land owner - -The land owner

-6 - After construction is complete who is responsible for maintenance and future
compliance of erosion control?

, 1 - Contractor for one year
2 - EPA
3 - Environmental Health
4 - Land owner - -Land owner

-7 - A permanent ground cover, sufficient to control erosion, must be installed within
which of the below times after completion of construction or development?

1 - 15 working days or 120 calendar days
2 - 15 working days or 30 calendar days
3 - 30 working days or 120 calendar days
4 - 30 working days or 90 calendar days - -30 working days or 120 calendar days

-8 - What is the minimum a sediment basin (A temporary sediment trap) should hold per
acre?

1 - 1800 square feet
2 - 1800 cubic feet
3 - 1800 gallons
4 - Over 1800 gallons - -1800 cubic feet

-9 - How deep should seedbed preparations be?

1 - 1 to 2 inches
2 - 2 to 3 inches
3 - 3 to 5 inches
4 - 4 to 6 inches - -4 to 6 inches

-10 - Land disturbing activity shall be permitted in proximity of a lake or waterway with a
buffer zone of sufficient width to confine visible silt within ___% of the buffer zone.

1 - 25
2 - 50
3 - 75
4 - 100 - -25

-11 - What is the maximum area of land that can be disturbed (as in grading) in which you
do not need a permit?

1 - 1.25 acre
2 - 1.50 acre
3 - 1.1 acre
4 - Any amount 1 acre or under - -Any amount 1 acre or under

Document information

Uploaded on
September 23, 2025
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AccurateScores
3.7
(122)
Sold
592
Followers
336
Items
15244
Last sold
1 week ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions