Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 95 pages
Exam (elaborations)

ACI – CONCRETE FIELD-TESTING TECHNICIAN GRADE 1 (UPDATED 2025/2026) – EXAM QUESTIONS & VERIFIED ANSWERS WITH COMPLETE SOLUTIONS – GRADED A+ – INSTANT PDF DOWNLOAD

Document preview thumbnail
Preview 4 out of 95 pages

ACI – CONCRETE FIELD-TESTING TECHNICIAN GRADE 1 (UPDATED 2025/2026) – EXAM QUESTIONS & VERIFIED ANSWERS WITH COMPLETE SOLUTIONS – GRADED A+ – INSTANT PDF DOWNLOAD

Content preview

ACI CONCRETE FIELD TESTING TECHNICIAN - GRADE I EXAM| ALL 133
MULTIPLE CHOICE QUESTIONS AND CORRECT ANSWERS| MOST RECENT
AND COMPLETE VERSION ALREADY GRADED A+| BRAND NEW!!!

,1|P a g e

Q1. Start molding specimens for strength tests within 30 minutes after fabricating the
composite sample.



A. True

B. False - ANSWER: B. False



ASTM C172 -Para (4.1.2) - Start molding.

specimens for strength tests within 15 min after fabricating the

composite sample.



Q2. The maximum allowable time between obtaining the first and last portions of the
composite sample may not exceed 5 minutes.



A. True

B. False - ANSWER: B. False



ASTM C172 - Para (4.1)- The elapsed time shall not exceed 15 min. between obtaining
the first and final portions of the composite sample.



Q3. The composite concrete sample must be protected from sun, wind, contamination
and rapid evaporation.

,2|P a g e




A. True

B. False - ANSWER: A. True



ASTM C172 - Para (4.1.2)



Q4. If the concrete contains aggregates larger than those that are appropriate for a size of
mold or equipment used, the sample should be wet sieved before making the test.



A. True

B. False - ANSWER: A. True



ASTM C172- Para (6.1)



Q5. The composite sample should not be remixed before beginning any tests.



A. True

B. False - ANSWER: B. False



ASTM C172-Para (4.1.1) -The sample shall be combined and remixed with a shovel the
minimum amount necessary to ensure uniformity and compliance with the maximum
time limits



Q6. Sampling should normally be performed, as the concrete is discharged from the

, mixer.

Document information

Uploaded on
September 22, 2025
Number of pages
95
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$10.56

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
11
Followers
0
Items
413
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions