• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 16 pages
Exam (elaborations)

Certified Mobile Crane Operator Prep Test 100% Correct Answers Verified Latest 2024 Version

Document preview thumbnail
Preview 3 out of 16 pages

Certified Mobile Crane Operator Prep Test 100% Correct Answers Verified Latest 2024 Version

Content preview

Certified Mobile Crane Operator Prep Test 100% Correct
Answers Verified Latest 2024 Version

•

1.Where must the operators manual be kept during
crane operations?: The operators manual must be always kept in the
cab
According to ASME B30.5, what are the minimal
2.
requirements to meet crane operator qualifications?: Physical,
Written Test, Practical Test
Which will have the greatest effect to the fulcrum of a
3.
crawler crane and have a major impact on capacity?: Working
over the rear
4. What hand signal must be always obeyed?: Stop
5. When removing pins or bolts from a boom assembly,
workers shall remain?-
: Out from under the boom
6. When may a crane be overloaded?: Never
What is the purpose of a boom length indicator?: To provide the
7.

actual boom length at the time of use
8. When can the operator leave the crane?: After securing the
crane
9. When can a crane be side loaded?: With a freely suspended load
1/
16

,10. The deflection of a boom will cause the load to?: Increase th
radius
11. Which inspection has a competent person making records
of the inspection?-
: Month
12. When should tag lines be used?: When the rotation of the suspended
load becomes hazardous
13. What shall be in the operators cab during crane
operations?: Load charts
14. Which of the following is considered duty-cycle work?:
Clamshell digging
When doing duty cycle work, most manufacturers
15.
require the cranes capac- ity to be reduced by?: 20%
16. Which components are not parts of the boom?: Heel pins
The boom angle on a lattice boom crane, is the angle
17.

between?: The ground and centerline of the boom, between sheaves and
heel pins
18. Three short audible signals means?: Back-up
According to ANSI B30.5, hand signal chart shall be
19.

posted where?: On the job site
2/
16

, 20. A signal person shall be?: A designed person, tested and qualified
21. An anti-two-block device can be used?: To test the LMI
22. Cranes should be load tested when?: After modifications




3/
16

Document information

Uploaded on
September 22, 2025
Number of pages
16
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$18.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Skillbuilder
3.4
(34)
Sold
1912
Followers
4
Items
2813
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions