BCN3761 MIDTERM UPDATED ACTUAL Questions and CORRECT Answers
1. what are the three basic types of documents used in a. bidding and contract
construction contracts? req.
a. Bidding and Contract Requirements b. drawings
b. Drawings c. specifications
c. Specifications
d. Marketing data
2. which of the following are included in the bidding a. instruction to bidders
documents but not in the construction contract docu- d. bid form
ments?
a. Instructions to Bidders
b. General Conditions of the Contract
c. Agreement Form
d. Bid Form
3. T/F; specifications describe the construction in text true
form
4. T/F; construction specifications apply only to the con- false
struction phase of a project
5. T/F; development of construction specifications for a false
project begins during the contract document phase
6. T/F; procurement documents include construction true
specifications
7. T/F; design-bid-build and design-build two valid true
method to procure a construction project
8. T/F; contract documents are identified in the agree- true
ment for a construction project
, 9. T/F; drawing are the graphic description of the work to true
be performed by the contractor
10. the agreement included which of the following for the a. summary of work to be
construction contract? performed by the contrac-
a. Summary of the work to be performed by the Con- tor,
tractor
b. Time within which work shall be completed b. time within work shall
c. Amount of money to be paid by Owner to Contractor be completed
d. All of the above
c. amount of money to be
paid by owner
d. All of the above
11. T/F; the purpose of the drawings and specifications true
is to communicate information between the archi-
tect/engineer and the contractor
12. T/F; the term 'work' is defined in the general conditions true
of the contract
13. the contract drawings designate which of the following a. identification of equip-
relationships between elements of a facility. ment
a. Identification of equipment b. limits of areas where
b. Limits of areas where work is performed work is performed
c. Dimensions and sizes of components in the con- c. dimensions and sizes of
struction components in the con-
d. All of the above struction
d. All of the above
14. T/F; drawings indicate which elements of the work false
shall be performed by specific contractors
1. what are the three basic types of documents used in a. bidding and contract
construction contracts? req.
a. Bidding and Contract Requirements b. drawings
b. Drawings c. specifications
c. Specifications
d. Marketing data
2. which of the following are included in the bidding a. instruction to bidders
documents but not in the construction contract docu- d. bid form
ments?
a. Instructions to Bidders
b. General Conditions of the Contract
c. Agreement Form
d. Bid Form
3. T/F; specifications describe the construction in text true
form
4. T/F; construction specifications apply only to the con- false
struction phase of a project
5. T/F; development of construction specifications for a false
project begins during the contract document phase
6. T/F; procurement documents include construction true
specifications
7. T/F; design-bid-build and design-build two valid true
method to procure a construction project
8. T/F; contract documents are identified in the agree- true
ment for a construction project
, 9. T/F; drawing are the graphic description of the work to true
be performed by the contractor
10. the agreement included which of the following for the a. summary of work to be
construction contract? performed by the contrac-
a. Summary of the work to be performed by the Con- tor,
tractor
b. Time within which work shall be completed b. time within work shall
c. Amount of money to be paid by Owner to Contractor be completed
d. All of the above
c. amount of money to be
paid by owner
d. All of the above
11. T/F; the purpose of the drawings and specifications true
is to communicate information between the archi-
tect/engineer and the contractor
12. T/F; the term 'work' is defined in the general conditions true
of the contract
13. the contract drawings designate which of the following a. identification of equip-
relationships between elements of a facility. ment
a. Identification of equipment b. limits of areas where
b. Limits of areas where work is performed work is performed
c. Dimensions and sizes of components in the con- c. dimensions and sizes of
struction components in the con-
d. All of the above struction
d. All of the above
14. T/F; drawings indicate which elements of the work false