CTQP Final Estimates Level 1 QUESTIONS AND WELL
DETAILED ANSWERS|| GRADED A+|| LATEST UPDATE
2025/26
1) A major function of the DOT is to carry out Construction and Reconstruction
programs to provide the public with adequate transportation service. -
CORRECTANSWER True
For the DOT, the management of Construction and reconstruction projects involves the
following specific responsibilities:
A. Planning, Programming and design
B. Contract administration
C. Contractor payments
D. Design and Contract Management
E. All of the above -CORRECTANSWER E. All of the above
3) To pay for the work performed by Contractors, progress and Final Estimates are
needed. True or False? -CORRECTANSWER True
DESIGN STANDARDS -CORRECTANSWER These standards are made available for
Design, Construction, Maintenance, and Utility operations on the State Highway
System. This booklet provides guidelines and technical drawings for design and
Construction personnel.
, SUPPLEMENTAL AGREEMENTS (SA) -CORRECTANSWER SA'S are work of a
different characteristic from that shown in the original plans and contract; such as to
clarify the Specifications, or pay for unforeseen work.
WORK ORDERS (WO) -CORRECTANSWER WO's are similar to SA's but can't be
used in all instances. They are used to include additional work into the original contract,
and to do minor changes.
JOINT PARTICIPATION AGREEMENTS (JPA) -CORRECTANSWER JPA's or Locally
Funded Agreements (LFA)'s are part of the State Contract with a separate Financial ID
Number. They are legal documents between the Department and other government or
private entities. The work would be a utility relocations or installations, etc.
1) Multiple choice. Which of the following is NOT officially considered to be a "Contract
Document"?
A. Supplemental Agreements and Work Orders.
B. Notebooks and Estimates Procedure Manual.
C. Standard Specifications.
D. Construction Manual.
E. CORRECTANSWERs B &D -CORRECTANSWER E. CORRECTANSWER B & D
DETAILED ANSWERS|| GRADED A+|| LATEST UPDATE
2025/26
1) A major function of the DOT is to carry out Construction and Reconstruction
programs to provide the public with adequate transportation service. -
CORRECTANSWER True
For the DOT, the management of Construction and reconstruction projects involves the
following specific responsibilities:
A. Planning, Programming and design
B. Contract administration
C. Contractor payments
D. Design and Contract Management
E. All of the above -CORRECTANSWER E. All of the above
3) To pay for the work performed by Contractors, progress and Final Estimates are
needed. True or False? -CORRECTANSWER True
DESIGN STANDARDS -CORRECTANSWER These standards are made available for
Design, Construction, Maintenance, and Utility operations on the State Highway
System. This booklet provides guidelines and technical drawings for design and
Construction personnel.
, SUPPLEMENTAL AGREEMENTS (SA) -CORRECTANSWER SA'S are work of a
different characteristic from that shown in the original plans and contract; such as to
clarify the Specifications, or pay for unforeseen work.
WORK ORDERS (WO) -CORRECTANSWER WO's are similar to SA's but can't be
used in all instances. They are used to include additional work into the original contract,
and to do minor changes.
JOINT PARTICIPATION AGREEMENTS (JPA) -CORRECTANSWER JPA's or Locally
Funded Agreements (LFA)'s are part of the State Contract with a separate Financial ID
Number. They are legal documents between the Department and other government or
private entities. The work would be a utility relocations or installations, etc.
1) Multiple choice. Which of the following is NOT officially considered to be a "Contract
Document"?
A. Supplemental Agreements and Work Orders.
B. Notebooks and Estimates Procedure Manual.
C. Standard Specifications.
D. Construction Manual.
E. CORRECTANSWERs B &D -CORRECTANSWER E. CORRECTANSWER B & D