100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

API 1169 TEST QUESTIONS WITH 100% CORRECT ANSWERS

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
19-09-2025
Written in
2025/2026

API 1169 TEST QUESTIONS WITH 100% CORRECT ANSWERS

Institution
API 1169
Course
API 1169









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
API 1169
Course
API 1169

Document information

Uploaded on
September 19, 2025
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

API 1169 TEST QUESTIONS WITH
100% CORRECT ANSWERS

Unconnected cylinders shall be stored in an approved storage area, preferably indoors,
but not near a building entrance - Answer-False

The motto for the common ground alliance organization is: "damage prevention is an
individuals responsibility" - Answer-False

Documents prepared for the development of real property and show the alignment of
any existing buried facilities and the presence and extent of any existing easements
and/or ROW are called: - Answer-Plats

The benefits of the designer using all reasonable means of obtaining information about
underground facilities in the area of the planned excavation are: - Answer-1. Facility
relocations are minimized
2. Safety in enhanced
3. Unexpected conflicts with facilities are eliminated
4. Gathering underground facility information and including this information in the
planning phase minimizes the hazards, cost, and work to produce the final project

The purpose of above ground markers is to identify underground facilities, not to locate,
for excavation or circumvent the one call process - Answer-True

Only nondestructive testing personnel shall interpret test results. - Answer-Level
2 or 3

Active corrosion is corrosion that is continuing or not arrested. - Answer-True

When steel butt welding fittings are used, they shall comply to: - Answer-ASME b 16.9,
ASME b16.28, or MSS so-75

Deflections caused by misalignment up to are not considered miter bends. -
Answer-3 degrees

Inspection personnel shall be qualified by and . - Answer-Training,
experience

Case crossings shall be inspected during installation to determine that the carrier pipe is
supported, sealed, and from the casing. - Answer-Insulated

, as used in ASME b31.8 is the portion of the route of a pipeline or main that lies
within, runs in a generally parallel direction to, and does not necessarily cross the rights
of way of a road, street, highway, or railroad. - Answer-Parallel encroachment.

All valves, fittings, flanges, bolting, pipe, and tubing shall be marked in accordance with
the marking sections of the standards and specifications to which the items were
manufactured or in accordance with the requirements of MSS so-25. - Answer-True

Metallic gaskets other than ring type or spirally wound metal gaskets shall not be used
with or lighter flanges. - Answer-ASME class 150

A is a pressure containing component used for repeated access to the interior
of a piping system. - Answer-Quick opening closure


When planning and designing the installation of new or replacement of existing
underground facilities, the designer follows all except: - Answer-The routing demanded
by the local environment association

Using qualified ensures that all contractors who bid and work on a project
employ safe work habits and are capable of performing the requested work - Answer-
Contractors

Crossing angle measured between the existing pipeline and the proposed location of
pipe and is recommended to be as close to as practical - Answer-90 degrees

is the plan deciding between the Owner and Crossing Party to specify the
details and provisions under which the crossing construction shall occur - Answer-
Crossing plan

is the property in which a pipeline company and a landowner both have a
interest. - Answer-Right of way (ROW), legal

All personnel have and should use stop work authority whenever there is a concern for
during the pressure testing operations. - Answer-Safety

Management responsibilities provide for and require that signs, barricaded or other
protective barriers are placed in a manner and at a distance sufficient to demarcate a
safe zone to protect personnel and the public from unanticipated pressure release or
equipment failure - Answer-True

Traceability is defined as the ability to trace the history, application, or location of that
under consideration - Answer-True

is the planning, organizing, monitoring, controlling and reporting of all aspects of
a project. - Answer-Project management

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
wisdompoint chamberlain college of nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
114
Member since
2 year
Number of followers
66
Documents
5393
Last sold
3 weeks ago
Nursing Tec

3.7

16 reviews

5
6
4
3
3
5
2
0
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions