Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

API 1169 Practice Test I Questions with 100% Correct Answers

Document preview thumbnail
Preview 2 out of 9 pages

API 1169 Practice Test I Questions with 100% Correct Answers

Content preview

API 1169 Practice Test I Questions
with 100% Correct Answers

In which of the following locations pertaining to a wetland would a trench breaker need
to be installed during a pipeline construction project? - Answer-At the Wetland boundary

According to OSHA, lockout devices must meet which of the following criteria when
considering the prevention of removal from the device or box it is attached to except
for? - Answer-Be constructed and printed so that exposure to weather conditions or wet
and damp locations will cause the tag to deteriorate

Ensure that trench breakers are installed at which of the following locations? - Answer-
At the edge of wetlands

If the Inspector is observing the Survey Crews at the beginning of the job, which of the
following documents would the Inspector be expected to be familiar with? - Answer-
Access road drawings, Line List, Issued for Construction (IFC) Drawings

Inspectors are expected to function at all times as - Answer-Representatives of the
owner/operator

Markers installed above ground and developed during the design process include the
following except: - Answer-Stationing

Part of quality management focused on increasing the ability to fulfill quality
requirements - Answer-Quality inprovement

US Federal Regulations state that a pipeline installed in normal excavation may not be
located within 50 feet of any private dwelling, industrial building, or places of public
assembly unless _ _ _. - Answer-12" of cover is added 36" cover requirement
If you lock out/ tag out an intake line on a pump station, what energy are you preventing
from being released? - Answer-Hydraulic

During a pipeline construction project, any questions that may arise rewarding quality
and acceptability of work, materials furnished, should be decided upon by which of the
following? - Answer-Inspector, Inspection Team, and or Owner/Operator

During hydro-tests, the mitigation procedures regarding secondary containment and
refueling for any pumps installed within _ _ should be covered within the projects spill
prevention and response procedures - Answer-100'

, Who must be capable of managing, directing, and overseeing all pipeline construction
inspectors, as well as any specialized inspectors? - Answer-Chief Inspector

Per US federal regulations, a weld must be removed if it has a crack that is more than
what percent of the weld length? - Answer-8%

During a JSA, the foreman mentions frostbite as a potential hazard. What classification
of hazards would frostbite fall under? - Answer-Climatic hazards.

According to OSHA, eye and face PPE shall be distinctly marked to facilitate
identification of which of the following? - Answer-The manufacturer

When spark hazards exist, which of the following is recommended: - Answer-Pockets
be eliminated from the front of clothing.

Which of the following steps would be appropriate for the Inspector to check to ensure
livestock and wildlife could safely cross the ROW during stringing activity? - Answer-
Removal of a section of pipe.

Inspectors are expected to: - Answer-Establish professional relationships

According to OSHA, synthetic web slings shall be removed from service if any of the
following conditions are present, except: - Answer-Muddy/wet lifting legs

How long should a fire watch remain after welding or cutting operations are complete? -
Answer-Until the hazard of fire no longer exists

Cathodic protection should be installed _ _ _. - Answer-As soon as feasibly possible but
no longer than 1 year from installation

Removal and disposal of all brush, undergrowth, and timber. - Answer-Clearing

Which of the following should be marked "Red" on a pipeline project? - Answer-
Cathodic protection lines

Which of the following statements best describes the purpose for above ground
markers? - Answer-Used to identify underground facilities, not to circumvent the one call
process or locate for excavation.

During arc welding protective spectacles with lateral coverage, arc goggles, or other
approved protective eye wear shall: - Answer-be used in addition to welding helmets or
hand shields with filter and cover lenses.

Document information

Uploaded on
September 19, 2025
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$17.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
wisdompoint
3.6
(19)
Sold
120
Followers
66
Items
5730
Last sold
2 months ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions