P-99 Low Pressure Boiler COF FDNY
P-99 Low Pressure Boiler COF FDNY Test
Questions and Answers
Question 1
A fill line in an oil burner system is a line used to:
Correct Answer
Fill the storage tank with oil.
Question 2
The aquastat is located
Correct Answer
Below the water line.
Question 3
All heating, combustion, and cooking equipment shall be installed with adequate
clearances from _______ construction.
Correct Answer
Combustible
Question 4
The equipment must be provided with ______ or the building construction shall be
_____ _____.
Correct Answer
Insulation.
Fire Protected
Page 1 of 21
, P-99 Low Pressure Boiler COF FDNY
Question 5
During operation the surface of combustible construction materials will not be raised
to a temp higher than _____ degrees F.
Correct Answer
170 degrees
Question 6
Equipment shall be so that the means of access for ordinary operation and
maintenance will not be _______.
Correct Answer
Hazardous
Question 7
Acceptance Tests:
Boilers shall not be placed in operation until they have been _____ and ____ and an
equipment ____ _____ has been issued by the ______.
Correct Answer
Inspected and tested.
Use permit, commissioner
Question 8
Periodic Inspections: All boilers must be inspected at least _____ a _____ including
chimney connections.
Correct Answer
Once a year
Question 9
Owners Annual Statement: The owner of each boiler shall file an _____ written
statement with the ________, specifying the _____of each boiler and ______ for
inspection.
Correct Answer
Annual, commissioner, location, arrangement.
Page 2 of 21
, P-99 Low Pressure Boiler COF FDNY
Question 10
Field Tests: all piping and oil storage tanks shall be _______ tested for tightness by the
______ before the system is operated.
Correct Answer
Hydrostatically, contractor
Question 11
The piping shall be tested at _____ times the max working pressure applicable to that
part of the piping system but at a pressure ____ than the test pressure required for the
storage tank.
Correct Answer
1/2, less
Question 12
The min pressure for testing tanks shall be ____ times the max working pressure but in
no case less than ____ psi.
Correct Answer
1 1/2, 25 psi
Question 13
The hydrostatic pressure must be maintained until all ____ and _____ have been visually
inspected for ___, but in no case less than _____ hour.
Correct Answer
Joints, connections, leaks, 1/2 hour.
Question 14
A record must be kept of the pressure test showing the name of the _____ and the
_____ at which the piping and tank were tested.
Correct Answer
Contractor, pressure
Page 3 of 21
P-99 Low Pressure Boiler COF FDNY Test
Questions and Answers
Question 1
A fill line in an oil burner system is a line used to:
Correct Answer
Fill the storage tank with oil.
Question 2
The aquastat is located
Correct Answer
Below the water line.
Question 3
All heating, combustion, and cooking equipment shall be installed with adequate
clearances from _______ construction.
Correct Answer
Combustible
Question 4
The equipment must be provided with ______ or the building construction shall be
_____ _____.
Correct Answer
Insulation.
Fire Protected
Page 1 of 21
, P-99 Low Pressure Boiler COF FDNY
Question 5
During operation the surface of combustible construction materials will not be raised
to a temp higher than _____ degrees F.
Correct Answer
170 degrees
Question 6
Equipment shall be so that the means of access for ordinary operation and
maintenance will not be _______.
Correct Answer
Hazardous
Question 7
Acceptance Tests:
Boilers shall not be placed in operation until they have been _____ and ____ and an
equipment ____ _____ has been issued by the ______.
Correct Answer
Inspected and tested.
Use permit, commissioner
Question 8
Periodic Inspections: All boilers must be inspected at least _____ a _____ including
chimney connections.
Correct Answer
Once a year
Question 9
Owners Annual Statement: The owner of each boiler shall file an _____ written
statement with the ________, specifying the _____of each boiler and ______ for
inspection.
Correct Answer
Annual, commissioner, location, arrangement.
Page 2 of 21
, P-99 Low Pressure Boiler COF FDNY
Question 10
Field Tests: all piping and oil storage tanks shall be _______ tested for tightness by the
______ before the system is operated.
Correct Answer
Hydrostatically, contractor
Question 11
The piping shall be tested at _____ times the max working pressure applicable to that
part of the piping system but at a pressure ____ than the test pressure required for the
storage tank.
Correct Answer
1/2, less
Question 12
The min pressure for testing tanks shall be ____ times the max working pressure but in
no case less than ____ psi.
Correct Answer
1 1/2, 25 psi
Question 13
The hydrostatic pressure must be maintained until all ____ and _____ have been visually
inspected for ___, but in no case less than _____ hour.
Correct Answer
Joints, connections, leaks, 1/2 hour.
Question 14
A record must be kept of the pressure test showing the name of the _____ and the
_____ at which the piping and tank were tested.
Correct Answer
Contractor, pressure
Page 3 of 21