Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 15 pages
Exam (elaborations)

ExAc - Types of Construction Project Delivery (CHOP 2.3.2 ) Questions and Answers with 100% Complete Solutions UPDATED!!!!

Document preview thumbnail
Preview 2 out of 15 pages

ExAc - Types of Construction Project Delivery (CHOP 2.3.2 ) Questions and Answers with 100% Complete Solutions UPDATED!!!!

Content preview

1|Page




ExAc - Types of Construction Project Delivery (CHOP
2.3.2 ) Questions and Answers with 100% Complete
Solutions UPDATED!!!!



Project delivery methods in the construction industry have evolved in
response to: - ANSWER -increased owner requirements;
-more urgent time frames;
-increased demands for quality and safety;
-the need to reduce adversarial relationships in construction;
-economic pressures.


Project delivery - ANSWER is a general term describing the
comprehensive process used to successfully complete the design and
construction of buildings and other facilities. The term is used to include
all the procedures, actions, sequences of events, obligations,
interrelations, contractual relations, and various forms of agreement


Stipulated Price Contract (Design-Bid-Build) - ANSWER the owner
engages an architect to prepare the design, drawings, and
specifications;the owner hires a contractor by competitive bidding to
build the facility under a construction contract (usually CCDC 2,
Stipulated Price Contract);the architect administers the contract, and
reviews and certifies the construction.

, 2|Page


This design-bid-build form of project delivery is characterized by: -
ANSWER its three distinct phases;
-its two independent contracts between the architect and the
client/owner;
-the contractor and the client/owner,
-the linear sequencing of the process.


Advantages of design-bid-build - ANSWER -widespread use and
familiarity;
-clear roles assigned to each party;
-generally a transparent process
thorough resolution of the program requirements and design prior to
construction;
-Direct professional relationship between the client / building users and
the architect;
-has a known price before construction begins.


Disadvantages of design-bid-build - ANSWER -Separation of design and
construction restricts useful communication;
-Clients sometimes perceive "extras" to be more prevalent and costly in
this form of project delivery than others
-The contractor is unknown when the construction documents are
prepared.

Document information

Uploaded on
September 18, 2025
Number of pages
15
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Performance
4.3
(239)
Sold
560
Followers
45
Items
19702
Last sold
1 hour ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions