Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

Mobile Cranes No. 1 UPDATED ACTUAL Exam Questions and CORRECT Answers

Document preview thumbnail
Preview 2 out of 11 pages

Mobile Cranes No. 1 UPDATED ACTUAL Exam Questions and CORRECT Answers

Content preview

Mobile Cranes No. 1 UPDATED ACTUAL
Exam Questions and CORRECT Answers
The load radius as shown on the capacity chart is the distance from the center of rotation to the
centerline of the vertical host line with: - CORRECT ANSWER The rated load suspended.


If the jib angle to ground is changed from 50 degrees to 40 degrees, this would affect the
capacity of the crane how? - CORRECT ANSWER Capacity will decrease.


Load capacity charts are based on 75% of tipping for crawler cranes without out riggers. For
wheel mounted cranes, using outriggers fully extended, capacities are based on what percentage
of tipping? - CORRECT ANSWER 85%


The operators should exercise extreme caution when lifting loads from the water mainly because:
- CORRECT ANSWER The load on the crane will increase as an object leaves the water.



On the upper works - CORRECT ANSWER On the carrier.



When working on soft soil with poor bearing support: - CORRECT ANSWER Use
matting to distribute crane's weight over a larger area.


The best way to determine the weight of a load to be lifted is to: - CORRECT
ANSWER Have a certified load weight and add in the weight of all rigging.


When a situation arises that will not permit outriggers to be set at positions that correspond to the
locations established by the manufacturer's load rating charts, the crane manufacturer shall be
consulted to determine if any capacity reductions, special operation procedures, or limitations are
required. If required information is not available from the manufacturer, whom shall be
consulted? - CORRECT ANSWER Qualified person.


When performing a pick and carry operation using a crawler crane, the load should be
positioned: - CORRECT ANSWER Over the front.

, A thick dark line running across the load chart means that the load listings: - CORRECT
ANSWER Above the lines are limited by structural factors.


Dynamic motion such as swinging with a load can cause what change in the crane operation? -
CORRECT ANSWER Increased load radius.


The dead end of the wire rope above the wedge socket must extend a minimum of 6 times the
rope diameter or: - CORRECT ANSWER 6 inches.



A work area chart is used to: - CORRECT ANSWER Identify capacity changes due to
operational quadrants.


Which of the following 3 sling hitches is listed in order from the strongest to the weakest? -
CORRECT ANSWER Basket, Vertical, Chocker.



An anti-2-block damage of prevention system will: - CORRECT ANSWER Prevent any
crane movements that will cause a 2-block condition.


The minimum distance for safety between the swing radius of the counter weight and any
obstacle is: - CORRECT ANSWER 2 Feet.


What is the best source of information for determining boom tip height? - CORRECT
ANSWER Working range diagram


Attachments or extra counter weights not approved by the manufacturer should not be attached
to the rear of the crane because: - CORRECT ANSWER They may cause a backward
stability problem.


The first thing an operator should do before traveling under a low pipe rack is: - CORRECT
ANSWER Post a signal person to check clearance.

Document information

Uploaded on
September 14, 2025
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STANFORDGENIUS
4.0
(236)
Sold
1557
Followers
108
Items
113226
Last sold
1 hour ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions