plpl plpl plpl plpl plpl plpl
Edition by Phil Simmons
plpl plpl plpl plpl
All Chapters Covered 1-21| Verified Questions & accurate Solutions
plpl plpl plpl plpl plpl plpl plpl plpl
for Exam Preparations| A+ GRADED
plpl plpl plpl plpl plpl plpl
1 | P a
plpl plpl plpl
g e
,2 | P a
plpl plpl plpl
g e
,Solution plpl and plpl Answer plpl Guide
CHAPTER P L P L 1: COMMERCIAL
PLPL P L P L BUILDING P L P L PLANS P L P L AND P L P L SPECIFICATIONS
TABLE P L P L OF P L P L CONTENTS
Review .......................................................................................................................................................... 1
Note to instructor: It is recommended that students be required to respond, where
plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl
appropriate, with answers that are complete sentences.
plpl plpl plpl plpl plpl plpl plpl
REVIEW
Refer to the National Electrical Code or the working drawings when necessary. Where
plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl
applicable, responses should be written in complete sentences.
plpl plpl plpl plpl plpl plpl plpl plpl
1. What plpl section of a commercial building’s
plpl plpl plpl plpl plpl specification contains plpl p l pl a
list
plpl plpl of contract documents?
plpl plpl
Answer: A list of the contract
p l p l documents is
p l p lcontained in p l p l p l p l p l p l p l p l p l p l p l p l p l p l
General
p l p l Clauses and Conditions. A listing
p l p l of the Commercial p l p l plpl p l p l p l p l p l p l p l p l p l p l
Building
p l p l contract documents is presented
p l p l in this chapter under the p l p l p l p l p l p l p l p l plpl plpl plpl plpl
heading ―Commercial Building Plans.‖ The instructor may wish to have
plpl plpl the plpl plpl plpl plpl plpl plpl plpl plpl p l p l
students
p l p l check over this listing and
p l p l compare it with the p l p l p l p l p l p l p l p l p l p l p l p l p l p l p l p l
plans
p l p l provided. p l p l
2. The requirement for temporary light and power at the job site will be found in what
plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl pl pl plpl plpl
portion of a commercial building’s specification?
plpl plpl plpl plpl plpl
Answer: The Supplementary General Conditions specifies the job site
plpl plpl plpl plpl plpl plpl plpl plpl
requirements for temporary light and power. In some contracts, this
plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl
electrical system becomes the responsibility of the general contractor; in other
plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl
contracts, it is the electrical contractor’s responsibility to install and maintain
plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl
the temporary electrical system. The instructor may wish to refer the student
plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl
to NEC Article 590 and discuss the requirements in detail.
plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl
3 | P a
plpl plpl plpl
g e
, 3. The electrician uses the Schedule of Working Drawings for what purpose?
plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl
Answer: The electrician uses the Schedule of Working Drawings to
plpl plpl plpl plpl plpl plpl plpl plpl plpl
determine whether all of the drawings are at hand. The information on
plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl
―the other sheets‖ may be very important, especially in coordinating with
plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl
other contractors.
plpl plpl
4. Complete the following items by indicating the letter(s) designating the
plpl plpl plpl plpl plpl plpl plpl plpl plpl
correct source(s) of information:
plpl plpl plpl plpl
No. Answer Item Information
4. Sections Ceiling height plpl Sections, p l p l Sheet p l p l A6
5. Electrical Electrical Electrical symbol schedule, Chapter plpl plpl plpl
symbol
plpl receptacle style
plpl plpl 2,
plpl Figure 2–6
p l p l plpl
schedul
plpl
e
6. Electrical Electrical Electrical layout drawings, Sheets plpl plpl plpl
layout
plpl outlet
plpl El, E2, and E3
plpl plpl plpl plpl
drawin
plpl location
plpl
gs
7. Elevations p l p l Exterior wall finishes plpl p l pl Elevations, plpl Sheets plpl A4 plpl and plpl A5
8. Site plpl plan Grading elevations plpl Site plan, plpl plpl Sheet plpl A4
9. Electrical Panelboard plpl schedules Electrical plpl layout plpl drawings, plpl Sheet plpl E4
layout
plpl
drawin
plpl
gs
10. Architectural Room width plpl Architectural floor plan, Sheets Al, plpl plpl plpl plpl
floor plan
plpl plpl A2, and A3
plpl plpl plpl
11. Architectural Swing plpl of plpl door Architectural floor plan, Sheets Al, A2, plpl plpl plpl plpl plpl
floor plan
plpl plpl and A3 plpl
12. Sections View of interior wall plpl pl pl plpl Sections, p l p l Sheet p l p l A6
Match the items on the left with those on the right by writing the letter
plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl
designation of the appropriate organization from the list on the right.
plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl plpl
4 | P a
plpl plpl plpl
g e