When the job is not completely understood, before continuing, employees shall obtain
from their supervisor. - correct answer ✔✔Specific instructions
If a State or Federal
regulation is more stringent than your company's safety rule, the
takes precedence. - correct answer ✔✔State or federal regulations
Safety manuals and codes dictate - correct answer ✔✔Minimum requirements
Safety Manuals cannot be a complete working guide, therefore additional safety practices will
be incorporated - correct answer ✔✔when they are considered necessary or desirable
A common function shared between all employees and stated in the safety manual is to be
personally and to do the job safely. - correct answer ✔✔Responsible and accountable
Which high voltage detector can be used to check for actual voltage levels? - correct answer
✔✔None
On which setting should the selector switch be placed on the Salisbury when doing a proximity
test from the ground on 7,200v overhead primary? - correct answer ✔✔Test 240v
What is the maximum voltage that may be checked with the White voltage detector? - correct
answer ✔✔40kv
, If the White Voltage
Detector does not read full scale during proper functionality testing and the battery has been
replaced, what should be done? - correct answer ✔✔Send it to the shop for repairs or
replacement and obtain another for use.
When testing primary voltage under 10kv with the White Voltage Detector - correct answer
✔✔it must be attached to an approved live line tool, used from an insulating platform, or used
from an insulating aerial device with all required PPE.
A grounded line
energized. - correct answer ✔✔Can become
When selecting grounds for use you should select the - correct answer ✔✔Shortest possible
The ground sets shall be placed - correct answer ✔✔at the work site in such a location that it
will not interfere with the worker.
The end of the grounding jumper that is to be connected to the ground/neutral shall be
installed - correct answer ✔✔First
Grounding cables shall have sufficient current carrying capacity to
damage to the cable. - correct answer ✔✔Activate protective devices
After you have determined that pole top rescue is necessary, your next step is to - correct
answer ✔✔Call for help
When ascending the pole and you first reach the victim you should stop - correct answer
✔✔Just below his feet
verified solution
When the job is not completely understood, before continuing, employees shall obtain
from their supervisor. - correct answer ✔✔Specific instructions
If a State or Federal
regulation is more stringent than your company's safety rule, the
takes precedence. - correct answer ✔✔State or federal regulations
Safety manuals and codes dictate - correct answer ✔✔Minimum requirements
Safety Manuals cannot be a complete working guide, therefore additional safety practices will
be incorporated - correct answer ✔✔when they are considered necessary or desirable
A common function shared between all employees and stated in the safety manual is to be
personally and to do the job safely. - correct answer ✔✔Responsible and accountable
Which high voltage detector can be used to check for actual voltage levels? - correct answer
✔✔None
On which setting should the selector switch be placed on the Salisbury when doing a proximity
test from the ground on 7,200v overhead primary? - correct answer ✔✔Test 240v
What is the maximum voltage that may be checked with the White voltage detector? - correct
answer ✔✔40kv
, If the White Voltage
Detector does not read full scale during proper functionality testing and the battery has been
replaced, what should be done? - correct answer ✔✔Send it to the shop for repairs or
replacement and obtain another for use.
When testing primary voltage under 10kv with the White Voltage Detector - correct answer
✔✔it must be attached to an approved live line tool, used from an insulating platform, or used
from an insulating aerial device with all required PPE.
A grounded line
energized. - correct answer ✔✔Can become
When selecting grounds for use you should select the - correct answer ✔✔Shortest possible
The ground sets shall be placed - correct answer ✔✔at the work site in such a location that it
will not interfere with the worker.
The end of the grounding jumper that is to be connected to the ground/neutral shall be
installed - correct answer ✔✔First
Grounding cables shall have sufficient current carrying capacity to
damage to the cable. - correct answer ✔✔Activate protective devices
After you have determined that pole top rescue is necessary, your next step is to - correct
answer ✔✔Call for help
When ascending the pole and you first reach the victim you should stop - correct answer
✔✔Just below his feet