• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 24 pages
Exam (elaborations)

CMIT/Construction management in training CMAA Exam Questions with correct Answers (A+ GRADED 100% VERIFIED) 2025/2026

Document preview thumbnail
Preview 3 out of 24 pages

CMIT/Construction management in training CMAA Exam Questions with correct Answers (A+ GRADED 100% VERIFIED) 2025/2026

Content preview

CMIT/Construction management in
training CMAA Exam Questions with
correct Answers (A+ GRADED 100%
VERIFIED) 2025/2026
In a CM-at-Risk arrangement once construction begins and the CM converts from
the professional advisory role of a CM to the contractual role of a general contractor,
the CM has no implied duties of loyalty and care to the owner.
True False - ANSWER: True

A 5D BIM model incorporates which project attribute?
A) Schedule
B) Quality
C) Phasing
D) Cost - ANSWER: D) Cost

A CM must be aware of its contractual obligations regarding safety on the project
site.
True False - ANSWER: True

A CM must purchase insurance coverage for protection against claims by its own
employees.
True False - ANSWER: True

A CM response/proposal to an owner's request for proposal can be considered an
offer to enter into a contract.
True False - ANSWER: True

A CM should seek the advice of legal counsel when preparing or modifying
contracts.
True False - ANSWER: True

A CM under an agency relationship, with the owner managing multi-prime
contractors, must consider its own risk first in managing those contractors.
True False - ANSWER: True

A CM, acting as an agent of the owner, will bond a multi-prime job.
True False - ANSWER: False

,A CM's liability is determined solely by whether or not the CM performed according
to the required standard of care.
True False - ANSWER: False

A CM's role and responsibilities are governed solely by the Owner/CM Agreement.
True False - ANSWER: True

A contract is an arrangement for the distribution of construction project risk between
the parties.
True False - ANSWER: True

A cost plus fixed fee contract is what type of contract?
A) Cost reimbursement
B) Lump sum
C) Time & material
D) Unit price - ANSWER: A) Cost reimbursement

A Dispute Review Board does not meet until there is a dispute.
True False - ANSWER: False

A general contractor working under a fixed price contract will always put its interests
ahead of the owner.
True False - ANSWER: True

A guaranteed maximum price can never change.
True False - ANSWER: False

A key advantage of the traditional delivery approach is:
A) With the traditional delivery system, the cost of the construction phase is known
before construction starts.
B) Facility features are fully determined & specified.
C) When the construction contract is signed, the major risk belongs to the contractor.
D) All of the above - ANSWER: B) Facility features are fully determined & specified.

A key element leading to successful project management is decision making based
on adequate information.
True False - ANSWER: True

A legal relationship by which one party is empowered and obligated to act on behalf
of another party is called:
A) An agreement
B) Agency
C) Addenda
D) A contract - ANSWER: B) Agency

, A limitation provision seeks to limit a party's liability to the party's client.
True False - ANSWER: True

A mediator cannot impose an agreement upon the parties.
True False - ANSWER: True

A method of compensation that creates a potential for conflict of interest between the
owner's interests and the CM's interests is indicative of an agency CM relationship.
True False - ANSWER: False

A mini-trial, whether required by contract or agreed to voluntarily, results in a binding
decision.
True False - ANSWER: False

A project delivery approach that is gaining acceptance for allocating risks among
project teams is referred to as the ________ method.
A) D-B
B) IPD
C) FAR
D) D-B-B - ANSWER: B) IPD

A project management system that utilizes a periodic consistent measurement of
work performed in terms of budget is known as a ____________ system?
A) CPM
B) ISO
C) Earned value
D) Value engineering - ANSWER: C) Earned value

A project schedule must always be in a CPM format.
True False - ANSWER: False

A Public-Private Partnership (P3) project is usually considered by a public entity for
which of the following primary reasons:
A) Better design
B) Incorporate environmental requirements
C) Lack of funding
D) Meet sustainability goals - ANSWER: C) Lack of funding

A QBS selection process will generally be based on what primary criteria?
A) Price
B) Past experience
C) Qualifications
D) Fee - ANSWER: C) Qualifications

Document information

Uploaded on
September 12, 2025
Number of pages
24
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
gradepapers465
3.0
(1)
Sold
15
Followers
0
Items
1176
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions