True or false? The interconnection coordination project manager coordinates the activities of
PJM internal coordination and the generation owner to complete the generator markets and
operations activities - CORRECT ANSWER True
True or false? In the event that a local geography name has already been used in another part of
PJM, a local landmark will be identified and used for the PJM naming convention - CORRECT
ANSWER True
True or false? A generation owner shall mean a member that owns or leases with right equivalent
to ownership or otherwise controls and operates one or more operating generation resource
located in the PJM region - CORRECT ANSWER True
True or false? When an application for authorization of a change in ownership transaction
involving a generation facility in the PJM region is filed with FERC, a copy of the publicly
available application should be served promptly to the general counsel of PJM and the general
counsel of IMM - CORRECT ANSWER True
A generation owner that changes its corporate name and or contact information shall notify PJM
and provide PJ M with the required documents within how many days
A. Three days
B. Five days
C. 10 days
D. 30 days - CORRECT ANSWER D. 30 days
MOC stands for
A. Market operations center
B. Market ownership center
, C. Monetary operation center
D. Maintenance operations center - CORRECT ANSWER A. Market operations center
In the MOC, the control center is required to achieve what percentage of an availability level for
its computer hardware and software
A. 50%
B. 75%
C. 99.95%
D. 100% - CORRECT ANSWER C. 99.95%
True or false? Telecommunication circuits which must be reliable and secure should be tested
regularly and or monitored online with special attention given to emergency channels -
CORRECT ANSWER True
What is a robust multi-protocol label switching (MPLS) network that connects member control
centers and plants to PJM's dual redundant control centers
A. PJMsys
B. PJMnet
C. PJMgov
D. PJMorg - CORRECT ANSWER B. PJMnet
What is a data system to connect remote assets and PJM to satisfy real time, market, and other
data transactions
A. JETstream
B. JETsys
C. JETgov
D. JETorg - CORRECT ANSWER A. JETstream
PJM EMS data is exchanged on all of the following cycles except