• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 1 pages
Exam (elaborations)

PD 1096 A || QUESTIONS WITH COMPLETE SOLUTIONS!!

Document preview thumbnail
Preview 1 out of 1 pages

Building Permit correct answers A written authorization granted by the Building Official to an applicant allowing him to proceed with the constrction of a specific project after plans, specifications, pertinent documents are found in conformity to PD 1096 Construction correct answers All on-site work done from site preparation, excavation, foundation, assembly of all the components and installation of utilities of building Erection correct answers Installation in lace of components of a building/structure Addition correct answers Any new construction which increases the height or area of an existing building/structure Alteration correct answers Construction in a building involving changes in the materials used, partitioning, location and size of windos, doors, structural parts, existing utilities but does not increase the overall area thereof. Renovation correct answers Any physical change made on a building to increase its value, utility and to improve its aesthetics quality Conversion correct answers A change in the use or occupancy of a building/structure or any portions thereof which has different requirements Repair correct answers Remedial work done on any damaged or deteriorated portions of a building/structure to restore its original condition Moving correct answers The transfer of a building of portions thereof from its original location or position to another, either within the same lot or to different one Demolition correct answers The systematic dismantling or destruction of a building/structure in whole or in part. Ancillary Building/Structure correct answers A secondary building/structure located within the same premises, the use of which is incidental to that of the main building/structure PD 1096 correct answers The National Building Code with its implementing rules and regulations to ensure safety to occupants

Content preview

PD 1096 A || QUESTIONS WITH COMPLETE
SOLUTIONS!!
Building Permit correct answers A written authorization granted by the Building Official to
an applicant allowing him to proceed with the constrction of a specific project after plans,
specifications, pertinent documents are found in conformity to PD 1096

Construction correct answers All on-site work done from site preparation, excavation,
foundation, assembly of all the components and installation of utilities of building

Erection correct answers Installation in lace of components of a building/structure

Addition correct answers Any new construction which increases the height or area of an
existing building/structure

Alteration correct answers Construction in a building involving changes in the materials used,
partitioning, location and size of windos, doors, structural parts, existing utilities but does not
increase the overall area thereof.

Renovation correct answers Any physical change made on a building to increase its value,
utility and to improve its aesthetics quality

Conversion correct answers A change in the use or occupancy of a building/structure or any
portions thereof which has different requirements

Repair correct answers Remedial work done on any damaged or deteriorated portions of a
building/structure to restore its original condition

Moving correct answers The transfer of a building of portions thereof from its original
location or position to another, either within the same lot or to different one

Demolition correct answers The systematic dismantling or destruction of a building/structure
in whole or in part.

Ancillary Building/Structure correct answers A secondary building/structure located within
the same premises, the use of which is incidental to that of the main building/structure

PD 1096 correct answers The National Building Code with its implementing rules and
regulations to ensure safety to occupants

Document information

Uploaded on
September 6, 2025
Number of pages
1
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$7.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ProPerfomer
3.8
(84)
Sold
443
Followers
322
Items
8859
Last sold
2 months ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions