• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

BUILDING LAWS - PD 1096 || QUESTIONS WITH 100% VERIFIED ANSWERS!!

Document preview thumbnail
Preview 2 out of 7 pages

Construction correct answers all onsite work done from site preparation, excavation, foundation, assembly of all the components and installation of utilities and equipment of buildings/structure Erection correct answers installation in place of components of a building/ structure Addition correct answers any new construction which increases the height or area of an existing building/structure Alteration correct answers construction in a building/ structure involving changes in the materials used, partitioning, location/ size of openings, structural parts, existing utilities and equipment but does not increase the overall area thereof. Conversion correct answers a change in the use or occupancy of a building/ structure or any portion/s thereof which has different requirements Renovation correct answers any physical change made on a building/ structure to increase its value, utility and/ or to improve its aesthetic quality Repair correct answers remedial work done on any damaged or deteriorated portion/s of a building/structure to restore its original condition Moving correct answers the transfer of any building/structure or portion/s thereof from its original location or position to another, either within the same lot or to a different one Demolition correct answers the systematic dismantling or destruction of a building/ structure, in whole or in part Ancillary Building Structure correct answers a secondary building/ structure located within the same premises, the use of which is incidental to that of the main building/structure Building Official correct answers -is charged with the duties of issuing building permits. In the performance of his duties - may enter any building or its premises at all reasonable times to inspect

Content preview

BUILDING LAWS - PD 1096 || QUESTIONS WITH
100% VERIFIED ANSWERS!!
Construction correct answers all onsite work done from site
preparation, excavation,
foundation, assembly of all
the components and
installation of utilities and
equipment of
buildings/structure

Erection correct answers installation in place of components of a building/ structure

Addition correct answers any new construction which
increases the height or area of an existing building/structure

Alteration correct answers construction in a building/
structure involving changes in the materials used, partitioning, location/ size of openings,
structural parts, existing utilities and equipment but does not increase the overall area thereof.

Conversion correct answers a change
in the use or occupancy of
a building/ structure or any
portion/s thereof which has
different requirements

Renovation correct answers any physical change made on a
building/ structure to increase its
value, utility and/ or to improve its
aesthetic quality

Repair correct answers remedial work done on any
damaged or deteriorated portion/s of a building/structure to restore its original condition

Moving correct answers the transfer of any
building/structure or portion/s thereof from its original location or position to another, either
within the same lot or to a different one

Demolition correct answers the systematic dismantling
or destruction of a building/ structure, in whole or in part

Ancillary Building Structure correct answers a secondary building/ structure located within
the same premises, the use of which is incidental to that of the main building/structure

Building Official correct answers -is charged with
the duties of issuing building permits. In the
performance of his duties
- may enter any building or its
premises at all reasonable times to inspect

, and determine compliance with the
requirements of this Code
- may order the
work stopped or order
discontinuance of occupancy or use

Building Permit correct answers a written authorization
granted by the Building Official to an
applicant allowing him to proceed with the
construction of a specific project after plans,
specifications and other pertinent documents have been found
to be in conformity with the National Building Code and its
Implementing Rules and Regulations

minor construction correct answers - sheds, outhouses, greenhouses, children's playhouses,
aviaries,
poultry houses and the like not exceeding 6sq.m.; detached from any other building and for
owner's private use
- addition of open terraces or patios resting directly on the ground, not
exceeding 20sq.m. and for owner's private use
- window grills
- garden pools not exceeding 500 mm depth
- erection of garden walls other than party walls not exceeding 1.80m in height, cementing of
footpaths, garden walks and/or driveways

Building Permit exemptions correct answers - minor construction
- repairs
- traditional indigenous family dwellings
- cost not exceeding 15,000
- single- detached dwelling up to 20 sqm
- public buildings
- government owned housing units (NHA)
- buildings by charitable institutions
- buildings owned by electric cooperatives

Repairs correct answers - not affecting or involving any structural member, such as
replacement of deteriorated roofing sheets or tiles, gutters,
downspouts, fascias, ceilings and/or sidings
- non load-bearing partition walls
- any interior portion of a house not involving addition or alteration
- replacement of windows, flooring, perimeter fence, walls
- or replacement of sanitary or plumbing fixtures
- or replacement of faulty or deteriorated wiring devices, fixtures and safety devices provided
no alteration shall be made on the service entrance and main switch or breaker and no circuits
will be added

Building Permit Requirements correct answers - Application form
- Five (5) sets of plans and specifications prepared, signed and sealed by duly licensed
architect and engineers
lot owners : TCT, Tax Decleration, current real property tax receipt

Document information

Uploaded on
September 6, 2025
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ProPerfomer
3.8
(84)
Sold
443
Followers
322
Items
8859
Last sold
2 months ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions