Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 45 pages
Exam (elaborations)

EPA Model Lead Based Paint Risk Assessor UPDATED ACTUAL Exam Questions and CORRECT Answers

Document preview thumbnail
Preview 4 out of 45 pages

EPA Model Lead Based Paint Risk Assessor UPDATED ACTUAL Exam Questions and CORRECT Answers 1978 - CORRECT ANSWER products - When did they reduce to Lead Levels in consumer The underside of a horizontal surface which projects beyond a wall line, such as an overhanging roof. - CORRECT ANSWER - What is a soffit? False - CORRECT ANSWER selecting a contractor. 1. There are big cracks in the walls. - T/F: The risk assessor should be involved in the process

Content preview

EPA Model Lead Based Paint Risk Assessor
UPDATED ACTUAL Exam Questions and
CORRECT Answers
1978 - CORRECT ANSWER - When did they reduce to Lead Levels in consumer
products


The underside of a horizontal surface which projects beyond a wall line, such as an overhanging
roof. - CORRECT ANSWER - What is a soffit?



False - CORRECT ANSWER - T/F: The risk assessor should be involved in the process of
selecting a contractor.


1. There are big cracks in the walls.
2. Ceiling is leaking in the bathroom and the kitchen.
3. The window wells are in disrepair- and contain paint chips.

4. Right across the street there's a battery recycling shop. - CORRECT ANSWER -
Scenario: You arrive on premises and are scheduled to conduct a visual assessment of the
property. Which do you take note of?


A risk assessment determines the Lead Hazards and An EBL investigation focus on where the
child has been and the cause or causes of exposure. - CORRECT ANSWER - What's the
difference between a risk assessment and an EBL child investigation


To determine and report the existence, nature, severity, and location of lead paint hazards and
potential remedies - CORRECT ANSWER - The objective of a Risk Assessment is:


A surface by surface investigation for determining the presence and location of lead based paint
and report the results - CORRECT ANSWER - What is the definition of a Lead
Inspection:

,- Condition of paint
- various pathways (dust and soil)

- Future plans (maintenance and rehabilitation) - CORRECT ANSWER - A Risk Assessor
must consider the following factors in addition to the concentration of lead in paint:


A supplement to - CORRECT ANSWER - A Risk assessment is best described as
_________ the approach of lead paint Inspection and Abatement.


In good condition - CORRECT ANSWER - A Lead Hazard screen is a type of Risk
assessment that applies to housing that is:


- Determining the most appropriate evaluation process and obtaining background information
- Conducting the evaluation and determining the actual hazards
-Providing guidance toward reducing and eliminating lead hazards and producing a written
report - CORRECT ANSWER - The Risk Assessment process developed by HUD include:


- Collect background information on the number of similar units in the development, the
construction date, and the number of children in each unit
- Collection information on the management and maintenance of the units within the
development - CORRECT ANSWER - Before conducting a Risk Assessment, the Risk
Assessor should:


Deteriorated paint, friction and impact surfaces, areas that have been mouthed by a child, bare
soil and accumulated dust. - CORRECT ANSWER - The Visual Assessment identifies:



<10% - CORRECT ANSWER - The condition of fair for interior components with small
surface areas would have ______ of deterioration:


Paint that is loosened or broken because of impact - CORRECT ANSWER - Chipped paint
is defined as:

,Chewing on lead contaminated components - CORRECT ANSWER - Children are most
commonly poisoned by:


<10 square feet - CORRECT ANSWER - The condition rating of fair for exterior
components with large surface areas would have______of deterioration.


It is relatively simple and inexpensive and Current EPA, HUD and State standards are based on
wipe sampling - CORRECT ANSWER - Dust Wipe sampling is recommended sampling
method for most routine risk assessment because:


250 ug/ft2 (micrograms/square foot) - CORRECT ANSWER - EPA defines a "dangerous
level of lead" in household dust from window sill as:


40 ug/ft2 (micrograms/square foot) - CORRECT ANSWER - The HUD standard for a
"dangerous level of lead" in household dust on an uncarpeted floor surface is:


Does not tear easily but is easy for laboratory to digest (ASTM E1972) - CORRECT
ANSWER - Wipe material should meet the following criteria:


- Need to be analyzed by a laboratory from a sample typically referred to as a Blank" to assure
wipes are not contaminated prior to use.

- Should be less than 5 ug (micrograms/wipe - CORRECT ANSWER - Background levels
if contamination on dust wipes:


a third wipe pass that focusing on the corners - EPA - CORRECT ANSWER - When
wiping a floor surface for dust lead collection, the last wipe pass is:


S - CORRECT ANSWER - Wipe samples generally are collected by wiping side-to-side in
an ______ shaped pattern

, True - CORRECT ANSWER - If the paint chips adhere to the wipe sample they should be
included as part of the sample


- hard floor surfaces and carpeted surface (separate)
- each different component tested (separate)

- and use a new wipe for each spot sampled. - CORRECT ANSWER - The Risk Assessor
should collect separate composite in a dwelling from:


A centrifuge tube or other hard shelled container - CORRECT ANSWER - Wipe sample
should be sent to a laboratory in:


400 ppm for high contact play area (400 ug/g) - CORRECT ANSWER - What is the lead
level standard in bare soil areas in a play area to be considered a lead hazard by EPA


1200 ppm (ug/g) - CORRECT ANSWER - What is the lead level standard in bare soil for
the rest of the yard:


At least 2 to 6 feet apart - CORRECT ANSWER - Samples collected in a non-play areas
of a building should be spaced:


X grid - CORRECT ANSWER - Samples collected from small patches or play areas with
bare soil should be collected along an _____ shaped grid.


The soil is completed covered by grass or pavement - CORRECT ANSWER - Soil
samples need not be collected if:


3 to 10 - CORRECT ANSWER - EPA recommends _______ subsamples (aliquats) for
each composite sample:


the top 1/2 inch - CORRECT ANSWER - EPA recommends ________ of soil to sent to
the laboratory for the purposes of a risk assessment:

Document information

Uploaded on
September 6, 2025
Number of pages
45
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STANFORDGRADESS
4.0
(238)
Sold
1578
Followers
108
Items
114633
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions