• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

Hbe - Homeowner Protection Act Questions

Document preview thumbnail
Preview 2 out of 8 pages

HBE - HOMEOWNER PROTECTION ACT QUESTIONS

Content preview

HBE - HOMEOWNER PROTECTION ACT QUESTIONS

An owner builder must not build a new home other than - Answer -(a) a detached
dwelling unit under one legal title, or
(b) a single dwelling unit in or attached to
(i) a pre-existing building, or
(ii) a new non-residential building that does not have another single dwelling unit in or
attached to it.
(2) Subject to local bylaws, the new home referred to in subsection (1) may include a
secondary suite.

Minimum standard of coverage - materials and labour - Answer -2 year

Minimum standard of coverage - building envelope - Answer -5 years

Minimum standard of coverage - structural - Answer -10 years

When you work full time, how do you manage your house building project?
A. You remotely manage your house building project
B. You engage sub-trades personally, come on the job site to supervise the work
whenever you can
C. You hire a relative to manage the project
D. Other - Answer -B

Can an owner-builder construct a duplex?
A. Under no circumstance
B. Only if permitted by municipal by-laws
C. Only with permission from HPO
D. Other - Answer -A. (secondary suite if bylaws allow)

How many years lease, for permission to be an owner builder - Answer -15

After building your second homeowner house, how long do you have to wait to build
your third?
A. 18 months
B. 3 years
C. 5 years
C. No wait - Answer -B

What is not within the authority of a compliance officer when conducting a site visit?
A. Question any person about the cost of materials and labour
B. Question any person about any matter that relates to licensing
C. Question any person about the work performed by construction workers
D. Question any person about the qualification of workers - Answer -A

, How does the Licensing & Consumer Services branch know the initial occupancy date?
- Answer -Owner builder must advise the date and this will be confirmed should the
property be sold within 10 years of occupancy

Define which of the following is an acceptable scope of work that a single subcontractor
can perform on an owner-built home?
A. Manage and complete all the structural components of a newly built home
B. Manage and pay all the sub trades involved in the construction of the owner-built
home
C. Complete the entire build if they have provided their references and have proven
experience
D. To complete the foundation, framing, roofing, cladding, windows and doors but not
the interior - Answer -A

What does the Owner Builder Authorization disclose? - Answer -The notice informs
buyers whether the home was built under an Owner Builder Authorization, when the 10-
year period started, and if there is a voluntary policy of home warranty insurance in
place.

If an owner builder home is sold within 10 years of occupancy, do subsequent owners
need to provide an owner builder authorization? - Answer -yes, Any subsequent
owners must also provide the Owner Builder Disclosure Notice if they sell the home to
another buyer within the 10-year period.

Should you sell your home within the first 10 years from the date of occupancy, you
must provide the purchaser with what? - Answer -Owner Builder Disclosure Notice

When can you sell a homeowner built house? - Answer -At least one year after first
occupancy (if the first authorization) or with special permission from the HPO

if the person has previously been issued an authorization, the person must not have
been issued an authorization for at least the following period of time, determined from
the date of first occupancy of the new home built under the most recent previous
authorization: - Answer -1 previous authorization = 18 months, 2= 3 years, 3 or more =
5 years

The owner-builder's brother in law is a licensed builder. What are the restrictions
regarding his involvement?
A. There are no restrictions since he is licensed
B. He cannot directly supervise workers
C. He cannot fulfil any general contractor duties
D. Other - Answer -C

How many jobs can a sole sub-contractor do before they must be licensed builder and
provide home warranty insurance? - Answer -Maximum 2 jobs

Document information

Uploaded on
September 5, 2025
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Greaterheights
4.0
(224)
Sold
1174
Followers
882
Items
20553
Last sold
4 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions