RWP Exam Questions With Correct Answer's Already
Passed!!!
1. Within what distance to the track is a road
worker considered fouling it? 4ft from near running
rail
2. Who authorizes movements on controlled track Operator/dispatcher
3. RWIC must be qualified in what RWP, NORAC and
physical
characteristics
4. Employee in charge (EIC) is in charge of what A work group
5. The main role of the RWIC is To establish on track
safety
6. On track safety briefing must be completed by who RWIC
7. Whistle boards are required when When working with 5
or more employees for
more than 1 hour
8. How is Job briefing documented NRPC 4104
9. When is the use of a supplemental shunting
device required? Any situation in which
equipment is used
dur- ing foul time for a
period longer than 5
minutes
10. What allows a RWIC to establish ETO Permission from
dispatch- er, flag man
at each en- trance,
fixed signals indi-
cating stop.
11. All movements on non controlled track must be
made at Restricted speed
1/
4
Passed!!!
1. Within what distance to the track is a road
worker considered fouling it? 4ft from near running
rail
2. Who authorizes movements on controlled track Operator/dispatcher
3. RWIC must be qualified in what RWP, NORAC and
physical
characteristics
4. Employee in charge (EIC) is in charge of what A work group
5. The main role of the RWIC is To establish on track
safety
6. On track safety briefing must be completed by who RWIC
7. Whistle boards are required when When working with 5
or more employees for
more than 1 hour
8. How is Job briefing documented NRPC 4104
9. When is the use of a supplemental shunting
device required? Any situation in which
equipment is used
dur- ing foul time for a
period longer than 5
minutes
10. What allows a RWIC to establish ETO Permission from
dispatch- er, flag man
at each en- trance,
fixed signals indi-
cating stop.
11. All movements on non controlled track must be
made at Restricted speed
1/
4