RWP Refresher Correctly Solved Exam Questions And Answers {100
rect}
Cor- 2025|2026
1. What type of work do Roadway Workers do?
E.) All of the Above
A.)Inspection and construction of railroad
track
B.)Maintenance of bridges.
C.)Repair of signal and communication
systems.
D.)Repair of roadway maintenance
machinery.
E.)All of the Above
2. Within what distance to the track is a Roadway Worker A.) 4 Feet from the
Nearest
considered fouling it? C.)All tracks
D.)Adjacent
A.)4 feet from the nearest running rail controlled
B.) 4 feet from centerline tracks
C.)4 feet from the edge of the tie
D.)4 feet from the far running rail
3. A authorizes movements on controlled
track
A.)RWIC
B.)Foreman
C.)Operator/Dispatcher
D.)Trainmaster
4. The RWIC is required to be qualified on physical
char- acteristics when their group is working on
A.) Only on controlled track
B.) Only on non-controlled track
, RWP Refresher Correctly Solved Exam Questions And Answers {100
rect}
Cor- 2025|2026
Running Rail
C.) All Tracks
C.) Operator/Dispatcher
5. B.) A work Group
, RWP Refresher Correctly Solved Exam Questions And Answers {100
rect}
Cor- 2025|2026
The Employee in Charge (EIC) is an employee who is
in charge of
A.) The movement of trains
B.) A work group
C.) 3 or more blocks of track
D.)A train station
C.) To Establish on Track
6. The main role of the RWIC is Safety
A.) To provide warning of approaching trains
B.) To ensure all employees arrive to work on time
C.) To establish on track safety
D.)To oversee the work being done
7. When can personal electronic devices be used while on C.) If there is an
emer-
duty? gency at the job site and no
other forms of commu-
A.)When a family member calls with an nication are available
emergency
B.)When on track safety has been established
C.)If there is an emergency at the job site and no
other forms of communication are available
D.)If the employee is an RWIC
A.) NRPC 4104
8. How is a job briefing documented?
A.)NRPC 4104
B.)In the RWIC's log book
C.)Verbal confirmation from all that attended
D.)On the back of the Form-D
9. When is an on-track safety briefing required?
rect}
Cor- 2025|2026
1. What type of work do Roadway Workers do?
E.) All of the Above
A.)Inspection and construction of railroad
track
B.)Maintenance of bridges.
C.)Repair of signal and communication
systems.
D.)Repair of roadway maintenance
machinery.
E.)All of the Above
2. Within what distance to the track is a Roadway Worker A.) 4 Feet from the
Nearest
considered fouling it? C.)All tracks
D.)Adjacent
A.)4 feet from the nearest running rail controlled
B.) 4 feet from centerline tracks
C.)4 feet from the edge of the tie
D.)4 feet from the far running rail
3. A authorizes movements on controlled
track
A.)RWIC
B.)Foreman
C.)Operator/Dispatcher
D.)Trainmaster
4. The RWIC is required to be qualified on physical
char- acteristics when their group is working on
A.) Only on controlled track
B.) Only on non-controlled track
, RWP Refresher Correctly Solved Exam Questions And Answers {100
rect}
Cor- 2025|2026
Running Rail
C.) All Tracks
C.) Operator/Dispatcher
5. B.) A work Group
, RWP Refresher Correctly Solved Exam Questions And Answers {100
rect}
Cor- 2025|2026
The Employee in Charge (EIC) is an employee who is
in charge of
A.) The movement of trains
B.) A work group
C.) 3 or more blocks of track
D.)A train station
C.) To Establish on Track
6. The main role of the RWIC is Safety
A.) To provide warning of approaching trains
B.) To ensure all employees arrive to work on time
C.) To establish on track safety
D.)To oversee the work being done
7. When can personal electronic devices be used while on C.) If there is an
emer-
duty? gency at the job site and no
other forms of commu-
A.)When a family member calls with an nication are available
emergency
B.)When on track safety has been established
C.)If there is an emergency at the job site and no
other forms of communication are available
D.)If the employee is an RWIC
A.) NRPC 4104
8. How is a job briefing documented?
A.)NRPC 4104
B.)In the RWIC's log book
C.)Verbal confirmation from all that attended
D.)On the back of the Form-D
9. When is an on-track safety briefing required?