Virginia HIC (Home Improvement Contractor) License EXAM LATEST UPDATED VERSION QUESTIONS AND VERIFIED CORRECT ANSWERS JUST RELEASED

Rating
-
Sold
-
Pages
59
Grade
A+
Uploaded on
02-09-2025
Written in
2025/2026

This document provides the most recent updated version of the Virginia HIC (Home Improvement Contractor) License Exam with verified correct answers. It covers essential knowledge areas including Virginia state laws and regulations, business management, contract requirements, building codes, safety standards, estimating and bidding, project management, and customer relations. Designed to meet Virginia DPOR licensing standards, this resource is an excellent study tool for candidates preparing for the Home Improvement Contractor License exam.

Show more Read less
Institution
Virginia HIC License
Course
Virginia HIC License

Content preview

Virginia HIC (Home Improvement Contractor)
License EXAM LATEST UPDATED VERSION
QUESTIONS AND VERIFIED CORRECT ANSWERS JUST
RELEASED
The bottom of a siding or soffit panel, or accessory piece, opposite the nail hem, which
locks onto the preceding panel is called the: - answer>>>buttlock


Standard Practice for Installation of Rigid Poly Vinyl Siding & Soffit - Page 1


Where installing a soffit on an open rafter, a soffit panel is to be cut to fit into the slots of
the F-channel. How much should be allowed per side for expansion? - answer>>>1/4"


Standard Practice for Installation of Rigid Poly Vinyl Siding & Soffit - Page 9


Corrosion resistant, self-tapping type, _______ truss head or pan head length sufficient
to penetrate wall thickness of steel stud or 3⁄4 in. into framing or furring should be used
with rigid PVC siding. - answer>>>No. 8


Standard Practice for Installation of Rigid Poly Vinyl Siding & Soffit - Page 3


Changes in temperature cause vinyl siding and accessories to expand and contract as
much as _______ over a 12 foot length. - answer>>>1/2"


Standard Practice for Installation of Rigid Poly Vinyl Siding & Soffit - Page 4

,When installing inside and outside corner posts for vertical siding, leave a _______ gap
between the top of the corner post and soffits or eaves. - answer>>>1/4"


Standard Practice for Installation of Rigid Poly Vinyl Siding & Soffit - Page 7


Do not store vinyl siding material in any location or in any manner where the
temperature of the siding, soffit or accessories is likely to exceed: - answer>>>130 F


Standard Practice for Installation of Rigid Poly Vinyl Siding & Soffit - Page 2


Which of the following is a flat material used on the face of the house, applied between
the studs and the siding (or over existing wall surface) to provide an even surface for the
installation of the vinyl siding? - answer>>>backerboard


Standard Practice for Installation of Rigid Poly Vinyl Siding & Soffit - Page 1


When installing fascia, measure the cover required, cut the fascia the proper width, and
punch snaplock "ears" every _______along the top of the fascia using a snaplock punch. -
answer>>>6"


Standard Practice for Installation of Rigid Poly Vinyl Siding & Soffit - Page 10


If installing siding during weather colder than 40°F, increase the minimum clearance to
_______ in. between the ends of panels and trim and any receiver such as J-channels and
corner poststo allow for additional expansion during warmer weather. - answer>>>3/8 in.


Standard Practice for Installation of Rigid Poly Vinyl Siding & Soffit - Page 3

,When applied, vinyl siding products must be attached "loosely," leaving approximately a
_______ inch space between the vinyl and the fastener head or crown to permit thermal
movement. - answer>>>1/32 inch


Standard Practice for Installation of Rigid Poly Vinyl Siding & Soffit - Page 4


What color markings would indicate the location of underground Gas lines? -
answer>>>High Visibility Safety Yellow


CFR Part 1926 and Related Standards - Page 10


What is the requirement for digging or excavating within 2 feet of a marked underground
utility line? - answer>>>All the above


CFR Part 1926 and Related Standards - Page 10


When may a protective system be eliminated in a trench that is less than five feet in
depth? - answer>>>When an examination of the ground by a competent person is
performed


CFR Part 1926 and Related Standards - Page 103


What is the greatest opening that may be cut in a floor for the disposal of materials? -
answer>>>25 percent of the aggregate of the total floor area


CFR Part 1926 and Related Standards - Page 107

, What is the support requirement for a retaining wall against which debris will be piled? -
answer>>>They shall not be used unless capable of safely supporting the imposed load


CFR Part 1926 and Related Standards - Page 108


What are the responsibilities of the qualified person related to employees working in a
confined space? - answer>>>Test the confined space immediately prior to entry


CFR Part 1926 and Related Standards - Page 12


When constructing an underground tunnel, what procedure is an employer required to
do regarding employee entering and leaving? - answer>>>Maintain a check-in/check-out
procedure to ensure head count


CFR Part 1926 and Related Standards - Page 13 & 14


What are the requirements regarding portable drinking water containers? - answer>>>All
the above


CFR Part 1926 and Related Standards - Page 16


How many toilets and handwashing facilities are required for 20 employees? -
answer>>>One toilet and one handwashing facility


CFR Part 1926 and Related Standards - Page 17

Written for

Institution
Virginia HIC License
Course
Virginia HIC License

Document information

Uploaded on
September 2, 2025
Number of pages
59
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$19.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
dennohz2000 Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
350
Member since
2 year
Number of followers
46
Documents
7771
Last sold
1 week ago

4.0

81 reviews

5
46
4
10
3
11
2
4
1
10

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions