• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

Exam (elaborations) SECB - Structural Engineering Certification Board

Document preview thumbnail
Preview 2 out of 11 pages

Exam (elaborations) SECB - Structural Engineering Certification Board

Content preview

NCCCO TOWER CRANE EXAM PRACTICE WITH 100%
CORRECT ANSWERS
Splices in rall tracks shall have - ANSWER- Smooth Joints

Hydraulic systems should have their proper fluid level checked - ANSWER- Daily

If power fails during operations, the following shouldn't apply - ANSWER- Do your best
to finish moving load where it was designated to go

If load is undetermined who is to find out if load weight does not exceed crane rating at
radius at which the load is to be lifted - ANSWER- Person responsible for lift

Where should climbing instructions be kept - ANSWER- ON Site

All climbing operations shall be performed under the supervision of - ANSWER-
Qualified person

When cranes are erected, load limiting devices shall be tested for proper setting and
operation - ANSWER- Before crane is placed in service

Hooks shall be equipped with latches unless the application makes the use of the latch -
ANSWER- Impractical

Size and position of signs or panels must satisfy the limitations of - ANSWER-
Manufacturer

Fall prevention measures are needed for working at locations where you are exposed -
ANSWER- To a fall of 6ft or more

Travel distance on hand levers shall not be greater - ANSWER- than 14 inches from
neutral position

For power lines rated 175KV the minimum clearance between the lines and any part of
the crane or load is - ANSWER- 15ft

All controls shall be tested by the operator at the - ANSWER- start of new shift

Before each climbing operation all load members of the support system shall be -
ANSWER- Inspected

Chain slings are required to be - ANSWER- ID tagged

, Welding on loads suspended by the crane can only be done if the load has - ANSWER-
Insulated slings

How much does an average cubic yard of concrete weight - ANSWER- 4,000 lbs

Main power switch for tower crane is - ANSWER- At base of crane

Items not listed in the frequent inspection checklist are - ANSWER- Hydraulic pumps
and valves for excessive wear or damage

When is it necessary to determine that there is no practical alternative way to perform
the needed work or to gain access to the area - ANSWER- Personnel Lift

Each series of voice signals shall contain three elements stated in the following order -
ANSWER- Function and Direction - Distance and speed - Function stop

When lifting personnel communication shall be maintained between three of the next
four - ANSWER- Person(s) being lifted - Operator - Signal person

The condition when the tower load block or hook assembly comes in contact with the
upper - ANSWER- Two-blocking

Load bearing members of the climbing and support system shall be inspected before
each - ANSWER- Climbing operation

Where shall a wind velocity indicating device be mounted - ANSWER- At or near the top
of crane

A velocity readout shall be provided - ANSWER- At the operators station

The area inside the self erecting tower cranes tail swing must be - ANSWER-
Barricaded

The self erecting tower crane must be properly grounded according with the -
ANSWER- National electric code (NEC)

Self Erecting tower crane erection must be performed by - ANSWER- Qualified person

Extensive planning must occur before a self erecting tower crane arrives on the job site.
The plan should be divided into two major sections as follows - ANSWER- Delivery, set
up, erection and dismantle - Lifting operations

According to ASME B30.3 the minimum wraps to be left on a hoist drum are -
ANSWER- 3

How much does a cubic foot of steel weigh - ANSWER- 490lbs

Document information

Uploaded on
September 2, 2025
Number of pages
11
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.59

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
1
Last sold
-



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions