Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 12 pages
Exam (elaborations)

Certified Storm Water Operator Training UPDATED ACTUAL Exam Questions and CORRECT Answers

Document preview thumbnail
Preview 2 out of 12 pages

Certified Storm Water Operator Training UPDATED ACTUAL Exam Questions and CORRECT Answers What are the three criteria to consider when determining if storm water discharge coverage is needed under the National Pollutants Discharge Elimination System (NPDES) industrial storm water permits? - CORRECT ANSWER -1. The industry is identified in the federal storm water regulations by SIC code or narrative description 2. There is a point source discharge of storm water to surface waters of the state 3. There is a potential for exposure of industrial materials or activities to storm water runoff

Content preview

Certified Storm Water Operator Training
UPDATED ACTUAL Exam Questions and
CORRECT Answers
What are the three criteria to consider when determining if storm water discharge coverage is
needed under the National Pollutants Discharge Elimination System (NPDES) industrial storm
water permits? - CORRECT ANSWER -1. The industry is identified in the federal storm
water regulations by SIC code or narrative description
2. There is a point source discharge of storm water to surface waters of the state
3. There is a potential for exposure of industrial materials or activities to storm water runoff


The industrial storm water certified operator should be someone who is at the facility
_________________________________ - CORRECT ANSWER -On a regular basis


The industrial storm water operator certificate is valid for _____________ - CORRECT
ANSWER -5 years


Under natural conditions the majority of rain water that falls to the ground
___________________________________________ - CORRECT ANSWER -Infiltrates
the ground or evaporates


The introduction of pollutants to storm water most commonly occurs when industrial facilities
allow operating procedures and industrial materials to __________________________________
- CORRECT ANSWER -Become exposed to storm water


The best way to prevent contamination of storm water is _______________________________ -
CORRECT ANSWER -Through pollution prevention


The highest percentage of pollutants in storm water runoff occur in the first few minutes that
storm water runs off. This is called the __________________________________ - CORRECT
ANSWER -First flush

, Organic enrichment of storm water runoff from sources such as food processing, airport deicing,
antifreezes, and sewage can provide a food source for bacteria in lakes and streams. This can
lead to ______________________________, which is a common cause of fish kills. -
CORRECT ANSWER -Oxygen depletion


The addition of __________________________________ to storm water runoff can result in
algal blooms and excessive growth of aquatic plants in fresh water systems such as lakes and
streams. - CORRECT ANSWER -Phosphorus


Sediment is one of the most widespread pollutants in surface water. Many
_____________________________ attach to finer sediment particles. Sediment can also be
destructive to aquatic systems by covering and damaging habitat. - CORRECT
ANSWER -Pollutants


If there is construction activity at an industrial facility that disturbs one or more acres of land or
the soil disturbance is within 500 feet of a water body, the owner of the property will need to
apply for a _____________________________. In addition if the soil disturbance will become
five or more acres in size the property owner will need to submit the Notice of Coverage
application to the MDEQ, Water Bureau. - CORRECT ANSWER -Soil Erosion and
Sediment Control


The _____________________________________ is a document that authorizes the discharge of
storm water under a general storm water permit. - CORRECT ANSWER -Certificate of
Coverage


_______________________________________ permits are site specific and contain
requirements such as regular sampling, monitoring, end of pipe treatment or effluent limits. -
CORRECT ANSWER -Individual


________________________________ permits are not site specific and contain the minimum
requirements for protecting water quality - CORRECT ANSWER -General

Document information

Uploaded on
August 31, 2025
Number of pages
12
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES
4.0
(235)
Sold
1541
Followers
108
Items
112237
Last sold
12 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions