PJM Generator Exam with correct |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answers
The purpose of the Deploy All Resources Action is to instruct all generating resources to be on
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
line and at full output _________ - correct answersimmediately upon receipt of dispatch
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
instruction
A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. Generation
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Operators should: - correct answersEnsure all unit voltage regulators are in service |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
PJM can issue the Deploy All Resources Action for________ - correct answersthe entire RTO,
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
specific Control Zones or a subset of a Control Zone if transmission limitations exist
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Under the National Terrorism Advisory System (NTAS) there are 2 types of alerts: Elevated
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Threat Alert and __________. - correct answersImminent Threat Alert
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
A Geomagnetic Disturbance Warning is issued by PJM when the NOAA has issued a warning or
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
an alert for a potential geo-magnetic storm of severity _______ or greater. - correct answersK7
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
The Generating Capacity reported on a Supplementary Status Report (SSR) includes which of
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
the following? (Select 2) - correct answersCapacity from offline Hydro and CT units that can be
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
synchronized within 10 minutes. |||\\\ |||\\\ |||\\\
Total Capacity from online Generation.
|||\\\ |||\\\ |||\\\ |||\\\
What is the requested response time for members to reply to a request for SSR data? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answers10 Minutes |||\\\
, If a PJM Member has received reports of a terrorism or sabotage threat to their facilities, they
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
would notify whom at PJM (in addition to NERC and the DOE) to share this information? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
correct answersThe PJM Shift Supervisor |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
What is the purpose of a capacity emergency warning? (Select 2) - correct answersTo keep
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Members informed of actual capacity shortages or contingencies that may jeopardize reliability |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
during real time operations. To ask Members to take specific actions in order to provide relief
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
to the PJM system |||\\\ |||\\\ |||\\\
PJM has issued a Minimum Generation Alert. Your current generation output is 200 MW. The
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Economic Minimum is 150 MW and Emergency Minimum is 125 MW. How much ERG should |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
be reported for this unit? - correct answers25 MW
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
A Manual Load Dump Warning will be issued when: - correct answersPrimary Reserve is less
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
than the largest generating unit or the loss of a transmission facility jeopardizes reliability after
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
all possible measures have been taken to increase reserves
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Actions in a Low Voltage Alert include: (Select 2) - correct answersRequest a Reactive Reserve
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Check
Review transmission and generation outages |||\\\ |||\\\ |||\\\ |||\\\
Which entities can cancel generator reactive capability tests prior to or during the testing
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
process? (Select 2) - correct answersPJM and the affected TO |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
With whom does PJM share the results of generation reactive capability tests? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answersThe affected TO |||\\\ |||\\\
How does the Generation Owner/Operator inform PJM and the TO of scheduled AVR or PSS
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
outages? - correct answerseDART |||\\\ |||\\\ |||\\\ |||\\\
answers
The purpose of the Deploy All Resources Action is to instruct all generating resources to be on
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
line and at full output _________ - correct answersimmediately upon receipt of dispatch
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
instruction
A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. Generation
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Operators should: - correct answersEnsure all unit voltage regulators are in service |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
PJM can issue the Deploy All Resources Action for________ - correct answersthe entire RTO,
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
specific Control Zones or a subset of a Control Zone if transmission limitations exist
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Under the National Terrorism Advisory System (NTAS) there are 2 types of alerts: Elevated
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Threat Alert and __________. - correct answersImminent Threat Alert
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
A Geomagnetic Disturbance Warning is issued by PJM when the NOAA has issued a warning or
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
an alert for a potential geo-magnetic storm of severity _______ or greater. - correct answersK7
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
The Generating Capacity reported on a Supplementary Status Report (SSR) includes which of
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
the following? (Select 2) - correct answersCapacity from offline Hydro and CT units that can be
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
synchronized within 10 minutes. |||\\\ |||\\\ |||\\\
Total Capacity from online Generation.
|||\\\ |||\\\ |||\\\ |||\\\
What is the requested response time for members to reply to a request for SSR data? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answers10 Minutes |||\\\
, If a PJM Member has received reports of a terrorism or sabotage threat to their facilities, they
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
would notify whom at PJM (in addition to NERC and the DOE) to share this information? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
correct answersThe PJM Shift Supervisor |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
What is the purpose of a capacity emergency warning? (Select 2) - correct answersTo keep
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Members informed of actual capacity shortages or contingencies that may jeopardize reliability |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
during real time operations. To ask Members to take specific actions in order to provide relief
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
to the PJM system |||\\\ |||\\\ |||\\\
PJM has issued a Minimum Generation Alert. Your current generation output is 200 MW. The
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Economic Minimum is 150 MW and Emergency Minimum is 125 MW. How much ERG should |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
be reported for this unit? - correct answers25 MW
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
A Manual Load Dump Warning will be issued when: - correct answersPrimary Reserve is less
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
than the largest generating unit or the loss of a transmission facility jeopardizes reliability after
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
all possible measures have been taken to increase reserves
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Actions in a Low Voltage Alert include: (Select 2) - correct answersRequest a Reactive Reserve
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Check
Review transmission and generation outages |||\\\ |||\\\ |||\\\ |||\\\
Which entities can cancel generator reactive capability tests prior to or during the testing
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
process? (Select 2) - correct answersPJM and the affected TO |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
With whom does PJM share the results of generation reactive capability tests? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answersThe affected TO |||\\\ |||\\\
How does the Generation Owner/Operator inform PJM and the TO of scheduled AVR or PSS
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
outages? - correct answerseDART |||\\\ |||\\\ |||\\\ |||\\\