True or false? The policy of PJM is to maintain at all times the integrity of the PJM RTO
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
transmission systems, the eastern interconnection, and to prevent any unplanned separation of |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
the transmission owners systems - correct answersTrue
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Who has an obligation to protect their own systems equipment and reliability
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
A. NERC |||\\\
B. Transmission/generation owner
|||\\\ |||\\\
C. Generator operator
|||\\\ |||\\\
D. Contractors - correct answersB. Transmission/generation owner
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
The strategy of the PJM system restoration plan is to
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
A. Restore the integrity of the interconnection as quickly as possible
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
B. Buy MW's as cheap as possible
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
C. Buy MW's as expensive as possible
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
D. Shed load - correct answersA. Restore the integrity of the interconnection as quickly as
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
possible
Which of the following is responsible for reporting the operating status and fuel situation
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
associated with PJM capacity resources |||\\\ |||\\\ |||\\\ |||\\\
A. Generation owner
|||\\\ |||\\\
B. Plant operator
|||\\\ |||\\\
C. PJM |||\\\
D. Transmission owner - correct answersA. Generation owner
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
, PJM mid-Atlantic control zone criteria is that if the frequency is at or below what Hz value for
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
30 seconds generation and load connected to the same bus may be sequestered
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
A. 55.0 |||\\\
B. 58.0 |||\\\
C. 60.0 |||\\\
D. 62.0 - correct answersB. 58.0
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
True or false? The under frequency load shedding schemes vary from control zone to control
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
zone - correct answersTrue |||\\\ |||\\\ |||\\\ |||\\\
The COM Ed control zone consists of three settings with what percent reduction of load at each
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
step
|||\\\
A. 5% |||\\\
B. 10% |||\\\
C. 25% |||\\\
D. 50% - correct answersB. 10%
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
The under frequency load shedding schemes in the PJM mid Atlantic zone are which of the
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
following
A. 59.3, 59.0, 58.7
|||\\\ |||\\\ |||\\\
B. 59.3, 59.0, 58.5
|||\\\ |||\\\ |||\\\
C. 59.5, 59.3, 59.1, 58.9, 58.7
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\
D. 59.3, 58.9, 58.5 - correct answersD. 59.3, 58.9, 58.5
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
During a restoration event where we experience a frequency decline, as a general rule of
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
thumb, shedding 6% of the load in the island should have a frequency impact of which of the
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
following
A. 0.01 Hz|||\\\ |||\\\
exam with correct answers |||\\\ |||\\\ |||\\\
True or false? The policy of PJM is to maintain at all times the integrity of the PJM RTO
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
transmission systems, the eastern interconnection, and to prevent any unplanned separation of |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
the transmission owners systems - correct answersTrue
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Who has an obligation to protect their own systems equipment and reliability
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
A. NERC |||\\\
B. Transmission/generation owner
|||\\\ |||\\\
C. Generator operator
|||\\\ |||\\\
D. Contractors - correct answersB. Transmission/generation owner
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
The strategy of the PJM system restoration plan is to
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
A. Restore the integrity of the interconnection as quickly as possible
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
B. Buy MW's as cheap as possible
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
C. Buy MW's as expensive as possible
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
D. Shed load - correct answersA. Restore the integrity of the interconnection as quickly as
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
possible
Which of the following is responsible for reporting the operating status and fuel situation
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
associated with PJM capacity resources |||\\\ |||\\\ |||\\\ |||\\\
A. Generation owner
|||\\\ |||\\\
B. Plant operator
|||\\\ |||\\\
C. PJM |||\\\
D. Transmission owner - correct answersA. Generation owner
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
, PJM mid-Atlantic control zone criteria is that if the frequency is at or below what Hz value for
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
30 seconds generation and load connected to the same bus may be sequestered
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
A. 55.0 |||\\\
B. 58.0 |||\\\
C. 60.0 |||\\\
D. 62.0 - correct answersB. 58.0
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
True or false? The under frequency load shedding schemes vary from control zone to control
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
zone - correct answersTrue |||\\\ |||\\\ |||\\\ |||\\\
The COM Ed control zone consists of three settings with what percent reduction of load at each
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
step
|||\\\
A. 5% |||\\\
B. 10% |||\\\
C. 25% |||\\\
D. 50% - correct answersB. 10%
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
The under frequency load shedding schemes in the PJM mid Atlantic zone are which of the
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
following
A. 59.3, 59.0, 58.7
|||\\\ |||\\\ |||\\\
B. 59.3, 59.0, 58.5
|||\\\ |||\\\ |||\\\
C. 59.5, 59.3, 59.1, 58.9, 58.7
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\
D. 59.3, 58.9, 58.5 - correct answersD. 59.3, 58.9, 58.5
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
During a restoration event where we experience a frequency decline, as a general rule of
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
thumb, shedding 6% of the load in the island should have a frequency impact of which of the
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
following
A. 0.01 Hz|||\\\ |||\\\