Which of the following balancing control modes is used by PJM under normal operations? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
correct answersTie-Line Bias |||\\\ |||\\\ |||\\\
Which of the following influences does PJM consider when performing their system load
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
forecast? - correct answersWeather Conditions & Day of the Week |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
All of the following are limits that must be submitted to PJM for generating units EXCEPT:
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
1. Eco Min |||\\\ |||\\\
2. Eco Max |||\\\ |||\\\
3. Emergency Max
|||\\\ |||\\\
4. Dynamic Instability - correct answersDynamic Instability
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
If PJM experienced an event that caused the loss of a 1,000 MW generator, which of the
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
following would most likely provide the quickest impact to improve the undegenerating Area
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Control Area (ACE)? |||\\\ |||\\\
1. Remedial Action Reserve
|||\\\ |||\\\ |||\\\
2. Synch Reserve
|||\\\ |||\\\
3. Non-Synch Reserve
|||\\\ |||\\\
4. Secondary Reserve - correct answersSynch Reserve
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Your system has experienced an event that caused the frequency to drop below 60.00 Hz, what
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
would be the most likely event that occurred? - correct answersA generator on your system
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
tripped offline |||\\\
,How does the PJM dispatcher inform the Members of the PJM regulation Requirements? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
correct answersAll-Call |||\\\ |||\\\
In order for your generator to quality to supply regulation in the PJM Regulation market, it
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
must be able to respond and attain its desired output within how many minutes? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answers5 minutes |||\\\
Based on a generator capability curve, in order to maximize the MVAR output of the generator,
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
it may be necessary to: - correct answersdecrease the MW output of the unit
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
PJM maintains a regulation quality standard which states that a generator may be certified to
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
provide regulation only after it achieves three consecutive regulation test scores of at least -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
correct answers75% |||\\\ |||\\\
Which of the following would NOT be a cause for a sudden deviation in the balancing area
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
ACE?
1. incorrect interchange number
|||\\\ |||\\\ |||\\\
2. loss of a tie-line RTU
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\
3. loss of internal load
|||\\\ |||\\\ |||\\\ |||\\\
4. loss of adjacent control area generation - correct answersloss of adjacent control area
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
generation
The primary purpose for the balancing area to have Regulation is to correct for: - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answerssmall deviations in load |||\\\ |||\\\ |||\\\
It is necessary for Generation Owner dispatchers to notify PJM of unplanned unit outages: -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
correct answersas soon as practicable |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
,PJM should be made aware of any fuel shortage that a generator may experience.
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
This information assists in analyzing the resources and reliably operating the system. A
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
heightened awareness is expected during: - correct answersextreme hot or cold conditions |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Generators are required to obtain PJM approval prior to removing a generating unit from |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
service.
The only exception is for: - correct answersinjury to personnel will be prevented
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Prior to removing a self-scheduled generator from service, the PJM member must first - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answersgive PJM the option to takeover the unit for the market
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
When PJM experiences problems with their primary digital control signal, it sometimes
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
becomes necessary for companies with the capability, to switch to the back-up signal.
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
This backup signal is known as: - correct answersAnalog control
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
When PJM sends cost signals to generators, to provide direction for increasing or decreasing
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
the facility output, this signal that is sent is known as: - correct answersDispatch Rate
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Under normal operating conditions, what is the limit that will provide the lowest output level
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
of a generating unit? - correct answersEco Min
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
When PJM send out a cost signal to generators to adjust their output, the generating personnel
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
adjust the output of the unit base on the unit's - correct answersprice or cost curve
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
incremental
, Which eSuite tool is used to maintain individual generator regulation data that is submitted by
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
PJM members? - correct answerseMarket |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
PJM's ACE configuration is such, that when the ACE is positive (+), it indicates - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answerstoo much generation |||\\\ |||\\\
If a generator is self-scheduled, what is the minimum notification time required in order for the
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
MW output to be adjusted? - correct answers20 minutes prior to the change
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
When corrections are made for the time error and the system scheduled frequency must be
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
changed to implement the correction, how much is the frequency scheduled adjusted by? - |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
correct answers+ /- 0.02 Hz |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
When PJM runs their Regulation test, how long do the tests normally run? - correct answers40
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
minutes
Your system has a 300 MW steam unit, but due to oil deliveries, the on-site fuel supply is
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
diminishing. |||\\\
What is the hourly threshold for reporting to PJM that the unit cannot operate at its maximum
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
capacity due to the fuel limitation? - correct answers72 hours |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
What is the regulation requirement for the PJM balancing area during on-peak hours? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answers1.0% of the forecasted peak load
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
What is the time requirement that a generator that wishes to self-schedule itself must provide
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
to PJM? - correct answers20 minutes
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
The PJM Peak Period Maintenance season occurs: - correct answersBetween the 24th & 36th
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Wednesdays of the year |||\\\ |||\\\ |||\\\
answers
Which of the following balancing control modes is used by PJM under normal operations? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
correct answersTie-Line Bias |||\\\ |||\\\ |||\\\
Which of the following influences does PJM consider when performing their system load
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
forecast? - correct answersWeather Conditions & Day of the Week |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
All of the following are limits that must be submitted to PJM for generating units EXCEPT:
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
1. Eco Min |||\\\ |||\\\
2. Eco Max |||\\\ |||\\\
3. Emergency Max
|||\\\ |||\\\
4. Dynamic Instability - correct answersDynamic Instability
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
If PJM experienced an event that caused the loss of a 1,000 MW generator, which of the
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
following would most likely provide the quickest impact to improve the undegenerating Area
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Control Area (ACE)? |||\\\ |||\\\
1. Remedial Action Reserve
|||\\\ |||\\\ |||\\\
2. Synch Reserve
|||\\\ |||\\\
3. Non-Synch Reserve
|||\\\ |||\\\
4. Secondary Reserve - correct answersSynch Reserve
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Your system has experienced an event that caused the frequency to drop below 60.00 Hz, what
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
would be the most likely event that occurred? - correct answersA generator on your system
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
tripped offline |||\\\
,How does the PJM dispatcher inform the Members of the PJM regulation Requirements? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
correct answersAll-Call |||\\\ |||\\\
In order for your generator to quality to supply regulation in the PJM Regulation market, it
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
must be able to respond and attain its desired output within how many minutes? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answers5 minutes |||\\\
Based on a generator capability curve, in order to maximize the MVAR output of the generator,
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
it may be necessary to: - correct answersdecrease the MW output of the unit
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
PJM maintains a regulation quality standard which states that a generator may be certified to
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
provide regulation only after it achieves three consecutive regulation test scores of at least -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
correct answers75% |||\\\ |||\\\
Which of the following would NOT be a cause for a sudden deviation in the balancing area
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
ACE?
1. incorrect interchange number
|||\\\ |||\\\ |||\\\
2. loss of a tie-line RTU
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\
3. loss of internal load
|||\\\ |||\\\ |||\\\ |||\\\
4. loss of adjacent control area generation - correct answersloss of adjacent control area
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
generation
The primary purpose for the balancing area to have Regulation is to correct for: - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answerssmall deviations in load |||\\\ |||\\\ |||\\\
It is necessary for Generation Owner dispatchers to notify PJM of unplanned unit outages: -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
correct answersas soon as practicable |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
,PJM should be made aware of any fuel shortage that a generator may experience.
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
This information assists in analyzing the resources and reliably operating the system. A
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
heightened awareness is expected during: - correct answersextreme hot or cold conditions |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Generators are required to obtain PJM approval prior to removing a generating unit from |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
service.
The only exception is for: - correct answersinjury to personnel will be prevented
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Prior to removing a self-scheduled generator from service, the PJM member must first - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answersgive PJM the option to takeover the unit for the market
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
When PJM experiences problems with their primary digital control signal, it sometimes
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
becomes necessary for companies with the capability, to switch to the back-up signal.
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
This backup signal is known as: - correct answersAnalog control
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
When PJM sends cost signals to generators, to provide direction for increasing or decreasing
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
the facility output, this signal that is sent is known as: - correct answersDispatch Rate
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Under normal operating conditions, what is the limit that will provide the lowest output level
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
of a generating unit? - correct answersEco Min
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
When PJM send out a cost signal to generators to adjust their output, the generating personnel
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
adjust the output of the unit base on the unit's - correct answersprice or cost curve
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
incremental
, Which eSuite tool is used to maintain individual generator regulation data that is submitted by
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
PJM members? - correct answerseMarket |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
PJM's ACE configuration is such, that when the ACE is positive (+), it indicates - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answerstoo much generation |||\\\ |||\\\
If a generator is self-scheduled, what is the minimum notification time required in order for the
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
MW output to be adjusted? - correct answers20 minutes prior to the change
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
When corrections are made for the time error and the system scheduled frequency must be
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
changed to implement the correction, how much is the frequency scheduled adjusted by? - |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
correct answers+ /- 0.02 Hz |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
When PJM runs their Regulation test, how long do the tests normally run? - correct answers40
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
minutes
Your system has a 300 MW steam unit, but due to oil deliveries, the on-site fuel supply is
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
diminishing. |||\\\
What is the hourly threshold for reporting to PJM that the unit cannot operate at its maximum
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
capacity due to the fuel limitation? - correct answers72 hours |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
What is the regulation requirement for the PJM balancing area during on-peak hours? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
answers1.0% of the forecasted peak load
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
What is the time requirement that a generator that wishes to self-schedule itself must provide
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
to PJM? - correct answers20 minutes
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
The PJM Peak Period Maintenance season occurs: - correct answersBetween the 24th & 36th
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\
Wednesdays of the year |||\\\ |||\\\ |||\\\