During reactive testing, which entity must give approval to change an approved voltage
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




schedule? |||\\\




PJM, TOP, MOC, GO - correct answersTO|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




Generation available within 10 minutes for offline reserve units: |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




Quick-start (hydro), manual, operating, supplemental - correct answersQuick-start (hydro)
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




Minimum MVARs for an individual generator that is required to do reactive testing? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




answers20 MVA |||\\\




Minimum MVARs for an aggregate of generators that is required to do reactive testing? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




correct answers75 MVA |||\\\ |||\\\ |||\\\




Power transformer is connected to the generator with which line? - correct answersPrimary
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




In a balancing authority region, If a site trips offline, what increases? - correct answerspositive
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




time error |||\\\




How many hours before NERCs 24hour deadline ends must you report disturbance to PJM? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




correct answers6 hrs |||\\\ |||\\\ |||\\\




How does PJM avoid dealing with economic issues during transmission related constraints -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




correct answerscost (offer) capping generation |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




If a generator doesn't have ICCP, what does it have to be linked through so data is available? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




correct answersSCADA (through EMS) |||\\\ |||\\\ |||\\\ |||\\\

,Which balancing control mode is used by PJM under normal operations? - correct answersTie
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




line bias |||\\\




the purpose for balancing area to have AR (area regulator) is to correct for: - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




answerssmall deviations in load |||\\\ |||\\\ |||\\\




what esuite tool is used to maintain individual generator regulation data that is submitted by
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




PJM members? - correct answerseMarket
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\




cold weather alert is for what temp? - correct answers10F
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




what are the three types of transmission constraint that PJM monitors? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




answersReactive, Stability, Thermal (transfer limits) |||\\\ |||\\\ |||\\\ |||\\\




which would be the last step PJM would take in attempting to relieve a transmission
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




constraint? - correct answersshed load |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




Load in PJM is generally served using ___ transmission service. - correct answersNetwork
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




Integration



If you were going to import, export, or wheel power through PJM, you would use ____
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




transmission services? - correct answerspoint-to-point? |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




what is an example of a quick start reserve? - correct answersHydroelectric
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




In order to lower system voltage, ___ must decrease to decrease _____ - correct answersMW,
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




MVAR

, what is PJM's reg requirement during a system restoration? - correct answers2% of current
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




load



During restoration conditions, what amount of load must be shed in order to increase
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




frequency by 1.0Hz - correct answers6-10% |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




During restoration conditions, what percentage of load must be shed in order to alter
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




frequency by 1% Hz? - correct answers1-2% of load to alter frequency by 1% |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




What is the approx. MVAR per mile of 500kV transmission that should be anticipated? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




answers1.70 MVAR per mile
|||\\\ |||\\\ |||\\\ |||\\\




Frequency during restoration process should be: - correct answers59.75-61Hz |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




A system will blackout at what frequency? - correct answers57.5 Hz or lower
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




What is the criteria for PJM to issue a Min Gen Alert? - correct answersWithin 2500 MW of
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




normal eco min limits |||\\\ |||\\\ |||\\\




Based on a generator capability curve, in order to maximize the MVAR output of the generator,
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




it may be necessary to: - correct answersdecrease MW output
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




It would be an acceptable action for PJM to request of a generator during periods of heavy
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




flows (load) and low voltages to lower real-time power output to ... - correct answersincrease
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




reactive power |||\\\




lowering the generator's current and increasing the voltage will also increase: - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




answersMVARs (reactive power) |||\\\ |||\\\

Document information

Uploaded on
August 29, 2025
Number of pages
16
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
progrades
4.0
(2)
Sold
14
Followers
0
Items
3893
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions