PJM Transmission Exam Study exam |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




with correct answers |||\\\ |||\\\




During System Restoration, what is the optimal Frequency Range? - correct answers59.75 - 61
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




Hz



The 500 kV system has normal bus voltages between? - correct answers500 to 550 kV
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




When Connecting 2 islands, the operator must match? - correct answersVoltage, Phase Angle
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




and Frequency
|||\\\




What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




correct answers30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




kV



When will PJM issue a Minimum Generation Alert? (how many MW under normal operating
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




limits) - correct answersWhen expected generation levels fall within 2500 MW of normal
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




operating limits |||\\\




When a thunderstorm is nearing the BES should auto-reclosing be turned on? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




answersYes



What does SCADA stand for? - correct answersSupervisory Control & Data Acquisition
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




What does IROL stand for? - correct answersInterconnection Reliability Operating Limit
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




What does eDART stand for? - correct answersDispatcher Application and Reporting Tool
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\

,What is eDART used for? (Electronic Disp Reporting Tool) - correct answersIt is used for:
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




Generation Outage Scheduling, Instantaneous Reserve Checks, Generator Reactive Capabilities
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




and to enter and submit switching
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\




What direction do VARS flow? - correct answersFrom HIGH Voltage to LOW Voltage
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




What direction do MW flow? - correct answersFrom HIGH Phase Angle to LOW Phase Angle
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




Which of the following factors are NOT used in forecasting load?
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




1) Weather Forecast
|||\\\ |||\\\




2) Historical Load Forecast
|||\\\ |||\\\ |||\\\




3) Historical Weather Data
|||\\\ |||\\\ |||\\\




4) Locational Marginal Pricing (LMP) Data - correct answers4
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




What one-way communication system is used to disseminate info to local call centers? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




answersAll-Call
|||\\\ |||\\\




The 3 categories of messages issued by PJM All-Call all EXCEPT:
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




1) Operational |||\\\




2) Informational|||\\\




3) Conflicting Interchange Values
|||\\\ |||\\\ |||\\\




4) Emergency Procedures - correct answers3
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




When should, transmission outages should be submitted to PJM to avoid cancellation and to be
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




considered "on time?' - correct answersFirst day of Month Prior to the Outage
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\

,What report will be requested by PJM when a Max Generation Alert is issued? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




answersSupplementary Status Report (SSR) |||\\\ |||\\\ |||\\\




The loss of a large generation unit on the PJM system can be detected by monitoring: - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




answersFrequency and PJM Area Control Error (ACE) |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




The PJM system is operated such that the contingency flow is less than the: - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




answersEmergency Rating |||\\\




When ordered a 5% voltage reduction should be taken on: - correct answersThe Distribution
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




System



TOs are required to report "Hot Line Work" on what voltage levels? - correct answers345 kV
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




and Above |||\\\




Load dump rating of an EHV line is determined by? - correct answers115% of the facility's 4
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




hour Emergency Rating |||\\\ |||\\\




During System Restoration, will closing additional tie lines increase the strength & stability of
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




an interconnected area? - correct answersYes
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




Which of the following factors influence load forecast (3)?
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




1) Weather
|||\\\




2) Temperature
|||\\\




3) Reactive Reserves
|||\\\ |||\\\




4) Day of the week - correct answers1, 2, 4
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\

, During system restoration, what is the voltage range the system should be kept between? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




correct answers90% and 105% maintain voltage profile between for system restoration
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




PJM will coordinate and direct all restoration lines of what voltage levels? - correct
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




answers500kV and above |||\\\ |||\\\




How much load would you dump to increase the frequency by 1 Hz (percentage range)? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




correct answers6-10% |||\\\ |||\\\




Generation is disconnected after 5 seconds, when the frequency: - correct answersDrops
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




below 57.5Hz |||\\\




How much of the total Dynamic Reserve should be used on Under Frequency relay load? -
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




correct answers |||\\\ |||\\\




During System Restoration, capacitor banks should be kept off until how much of the load is
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




restored? - correct answers40% |||\\\ |||\\\ |||\\\ |||\\\




Would PJM assume Frequency Control when the control of an interconnected area is too
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




burdensome for any Local Control Center? - correct answersYes |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




Operator receiving an All-Call message should state the following before playback of the
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




message? - correct answersName and Company |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




Dynamic Reserves consist of: - correct answersGovernor Reserve and Load that has been
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




restored with under frequency relays |||\\\ |||\\\ |||\\\ |||\\\

Document information

Uploaded on
August 29, 2025
Number of pages
33
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
progrades
4.0
(2)
Sold
14
Followers
0
Items
3893
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions