Which of the following is NOT A beneficial use of water - correct
answer- Flushing a spill down a storm drain
When installing and maintaining a check dam make sure -
correct answer- The low point (overflow) of the check dam is in
the middle of the channel
To reduce the possibility of undercutting in channels, you
should - correct answer- Install filter fabric under rock and
similar materials placed within the stormwater conveyance
The good housekeeping section of the SWPP must include all
BUT which of the following - correct answer- Post construction
stormwater management procedures
, Runoff controls include all but which of the following - correct
answer- Rolled erosion control products
Which erosion control best management practice increases
water filtration, dissipates rainfall energy and slows over flow of
stormwater - correct answer- Vegetation
Of the following factors that influence erosion rates, the one a
contractor has the most control over (only select one) is -
correct answer- Groundcover
Temporary stabilization should be implemented - correct
answer- Immediately on all disturbed areas that are likely to or
will remain inactive for 14-days or more
The primary purpose of a construction exit is - correct answer-
To remove sediment from construction site vehicles and
minimize trackout
Common types of erosion include all of the following except -
correct answer- Sedimentation
DVP SWPPP Actual Exam Questions With
100% Correct Solutions Latest Updates 2025
Graded A+.
Which of the following is NOT A beneficial use of water - correct
answer- Flushing a spill down a storm drain
When installing and maintaining a check dam make sure -
correct answer- The low point (overflow) of the check dam is in
the middle of the channel
To reduce the possibility of undercutting in channels, you
should - correct answer- Install filter fabric under rock and
similar materials placed within the stormwater conveyance
The good housekeeping section of the SWPP must include all
BUT which of the following - correct answer- Post construction
stormwater management procedures
, Runoff controls include all but which of the following - correct
answer- Rolled erosion control products
Which erosion control best management practice increases
water filtration, dissipates rainfall energy and slows over flow of
stormwater - correct answer- Vegetation
Of the following factors that influence erosion rates, the one a
contractor has the most control over (only select one) is -
correct answer- Groundcover
Temporary stabilization should be implemented - correct
answer- Immediately on all disturbed areas that are likely to or
will remain inactive for 14-days or more
The primary purpose of a construction exit is - correct answer-
To remove sediment from construction site vehicles and
minimize trackout
Common types of erosion include all of the following except -
correct answer- Sedimentation