1. What area(s) of consideration should the AV Ensure adequate power
source(s), en-
professional address with the client regarding sure AV program source
access.
building structure and AV service issues?
2. How is an AV project estimate Calculating goods, labor, materials
created for a client? and other projected costs, plus a
markup.
3. What is the diagram shown in the exhibit used Helps in sequencing
and scheduling
for in AV management activities? project events.
4. Detailed descriptions of specific
Request for proposal (RFP) for labor and
services, ex- perience required for service providers
proposed project staff and AV drawings
may be included when cre- ating a(n)?
5. Which pieces of equipment are Signal Generator and Signal Analyzer
necessary for testing leads and
evaluating an audio signal chain?
6. When commissioning for video display instal- Confirm brightness, contrast
and color
lation, how will the AV technician test to pictured in the
en- sure that the video display system exhibit?
is working properly?
7. What type of diagram or drawing is
1/
20
, CTS PRACTICE EXAM QUESTIONS WITH ALL CORRECT &
100% VERIFIED ANSWERS|UPDATED TO PASS
djustments using SMPTE PLUGE Pat- tern.
Block Diagram
2/
20
, CTS PRACTICE EXAM QUESTIONS WITH ALL CORRECT &
100% VERIFIED ANSWERS|UPDATED TO PASS
8. If an AV professional believes that an Why the VLAN is necessary.
AV sys- tem requires its own VLAN
(Virtual Local Area Network),what
information must be commu- nicated to
the AV professional's IT counter- parts?
9. Noise in a room can be a distraction to HVAC fans, dittusers and air
users and have an impact on the handlers.
effectiveness of an AV system. Which of
the following generates mechanical and
structural noise?
10. What would mechanical drawings be Locations of heating, plumbing and
used to determine on a site visit? ventilation in a venue.
11. If the text size in a projected presentation is 3 450 inches (11,400
mm)
inches (76 mm), then the viewer should
not be farther away than for reading
the text?
12. One major difference between the Measurement of service through
Service Level Agreement process and moni- toring procedures.
the traditional Program Report is the
SLA focuses upon?
13. When would an AV contractor need to consid- On a contract with a
3/
20
100% VERIFIED ANSWERS|UPDATED TO PASS
1. What area(s) of consideration should the AV Ensure adequate power
source(s), en-
professional address with the client regarding sure AV program source
access.
building structure and AV service issues?
2. How is an AV project estimate Calculating goods, labor, materials
created for a client? and other projected costs, plus a
markup.
3. What is the diagram shown in the exhibit used Helps in sequencing
and scheduling
for in AV management activities? project events.
4. Detailed descriptions of specific
Request for proposal (RFP) for labor and
services, ex- perience required for service providers
proposed project staff and AV drawings
may be included when cre- ating a(n)?
5. Which pieces of equipment are Signal Generator and Signal Analyzer
necessary for testing leads and
evaluating an audio signal chain?
6. When commissioning for video display instal- Confirm brightness, contrast
and color
lation, how will the AV technician test to pictured in the
en- sure that the video display system exhibit?
is working properly?
7. What type of diagram or drawing is
1/
20
, CTS PRACTICE EXAM QUESTIONS WITH ALL CORRECT &
100% VERIFIED ANSWERS|UPDATED TO PASS
djustments using SMPTE PLUGE Pat- tern.
Block Diagram
2/
20
, CTS PRACTICE EXAM QUESTIONS WITH ALL CORRECT &
100% VERIFIED ANSWERS|UPDATED TO PASS
8. If an AV professional believes that an Why the VLAN is necessary.
AV sys- tem requires its own VLAN
(Virtual Local Area Network),what
information must be commu- nicated to
the AV professional's IT counter- parts?
9. Noise in a room can be a distraction to HVAC fans, dittusers and air
users and have an impact on the handlers.
effectiveness of an AV system. Which of
the following generates mechanical and
structural noise?
10. What would mechanical drawings be Locations of heating, plumbing and
used to determine on a site visit? ventilation in a venue.
11. If the text size in a projected presentation is 3 450 inches (11,400
mm)
inches (76 mm), then the viewer should
not be farther away than for reading
the text?
12. One major difference between the Measurement of service through
Service Level Agreement process and moni- toring procedures.
the traditional Program Report is the
SLA focuses upon?
13. When would an AV contractor need to consid- On a contract with a
3/