CTS-D EXAM WITH ALL CORRECT & 100% VERIFIED
ANSWERS|UPDATED TO PASS

According to best practice who is the owner's representative on an AV project ✔Correct answer-
Manager or committee to organize communications selected by the owner

Which of the following must be known and considered while designing the user interface of an AV
system ✔Correct answer-The end-users skill level

What steps are required for the AV consultant to provide the program report ✔Correct answer-
Facility survey, end-user interviews, and project requirements

In the bid (tender) process what items should the AV documents RFP detail in order to complete the
scope of work for a given project ✔Correct answer-Qualifications, equipment, and performance
requirements

The most common way to show project schedules task and milestones is by using a ✔Correct
answer-Gantt Chart

During the program phases interviews with the end-user or owner representatives is beneficial in
order to ✔Correct answer-Gain an overview of their vision and how they will use the system.

How does one define project responsibilities and identify AV technology requirements? ✔Correct
answer-Follow the project directory and program report

What information is needed to create a conceptual design including budget estimates? ✔Correct
answer-A needs analysis

An AV integrators documentation that include scope of work, definitions of system, and
responsibilities should be defined in the _______ document. ✔Correct answer-Systems
Specification

What is the primary goal of a needs analysis? ✔Correct answer-Identifying the intended use of the
space.

Which of the following documents need to be the most rigidly adhered to when working on a system
design? ✔Correct answer-Regulatory requirements

In a proposed presentation room with a flat floor and theater style seating, what has the greatest
influence on the visibility of a projector screen ✔Correct answer-Ceiling height

A ball room will be equipped with ceiling mounted loudspeakers for sound reinforcement for a
seated audience. The elevation drawings scale is a 1/4" equals 1'. Use an architect scale, the ceiling
height is 3". What is the actual distance from the finish ceiling to the listeners ear? ✔Correct
answer-1/4"=.25"
3"/.25"=12'
12'-4' =8'
Answer= 8'

,A conference room is 40' x 30' in the ceiling is 10 feet high. Ceiling loudspeakers will be used to cover
the room for speech reinforcement with a target SPL level of 75 dB SPL. The loudspeakers have a
coverage circle diameter of 12 foot. The spacing between loudspeakers is approximately 8.5 foot.
Assuming the ceiling mounted loudspeakers are part of a 70 V distributed system what is the
minimum size power amplifier that should be used? Loudspeaker sensitivity 91 dB SPL at 1 W divided
by 1 AM transformer taps available are 70 V: 60 W 30 W 15 W 7.5 W 100 V: 60 W 30 W 15 W.
✔Correct answer-200 W

If the efficiency rating of an amplifier is 65% and the amplifier draws 7 A at 120 V of alternating
current. What is the heat load it generates ✔Correct answer-2850 BTU/hour

According to best practices what is a safe working load requirements for overhead mounting of a 75
pound projector? ✔Correct answer-375 pounds

A customer needs to interconnect two buildings on their campus. Your AV design requires 4 network
connections between the buildings. What is the smallest conduit that the customer will need to run
between the buildings? ✔Correct answer-1 inch

What is the recommended highest ambient lighting level illuminating a front projector screen within
a videoconferencing space ✔Correct answer-5 foot candles (50 Lux)

Why might you recommend to an A/V client to set up a dynamic host configuration protocol server
system? ✔Correct answer-Reduced possibility of address duplication

Which is an important consideration for AV designers concerning a clients existing wireless network
✔Correct answer-data security/encryption issues

During the design phase of a project that has many network enable AV devices. What will the IT team
need from the AV designer? ✔Correct answer-Device bandwidth requirements

A meeting room requiring speech reinforcement has an ambient sound pressure level reading at 76
decimals. What action should be taken: ✔Correct answer-Designer shall notify client that the
ambient noise will prevent the system from achieving an acceptable loudness level.

What are the characteristics that could affect an RT 60 measurement? ✔Correct answer-
Absorption, Reflection and Diffusion

If your venue is located in an earthquake prone region, what mounting precautions need to be taken
to ensure the safety and security of a persons and property ✔Correct answer-Stabilizer arms, sway
bars, and safety cable should be utilized.

When designing AV control system in a building that requires the fire control system to be integrated,
what is a major concern if the fire alarm initiate? ✔Correct answer-The program audio system is
muted.

Electric shielding is use for what condition? ✔Correct answer-Contain electric and magnetic field at
the source

Which of the following amplifiers would you specified for a 30' x 40' conference room with a 10 foot
ceiling. The requirements are to provide a system with two front speakers, and two zones of ceiling
speakers? ✔Correct answer-4 channel 300 W/ch at 70 V or 4 ohms

, What is the most beneficial result of signal separation in an AV rack design? ✔Correct answer-
Reducing the effects of the EMI

What are advantages to using digital signals over analog signals? ✔Correct answer-The ability to
carry more than one signal type at a time.

One way to plant for future AV expansion in the system is to: ✔Correct answer-Set up initial signal
path and switchers with extra inputs.

What is the best option to reduce cost for value engineering? ✔Correct answer-Use alternative
approaches to streamline the design while maintaining functionality.

Under what circumstances might you advise a client to implement a multipoint videoconferencing
control unit? ✔Correct answer-For distance learning to eight classrooms.

During the _________ phase of design the AV designer needs to help the architect address such
issues as mechanical and electrical equipment placement, as well as sightline issues affecting ceiling
height. ✔Correct answer-Design development

What factors besides the inverse square law of sound must be considered when measuring sound
levels at the venue and filing reports? ✔Correct answer-Absorption, diffusion, reverberant (RT 60),
background noise (NC, or RC)

What type of light, besides light coming directly from the source, must be measured? ✔Correct
answer-Ambient

For measuring the light received at a particular location coming directly from a source, what measure
an instrument should be used? ✔Correct answer-Lux or footcandles with an incident meter.

Using a floor plan, how would the AV designer confirm room dimensions? ✔Correct answer-Use
the scale to measure and convert to feet and meters

An AV conduit Riser diagram will show information such as: ✔Correct answer-Junction and pull
boxes

On what drawing would a projector sight lines found? ✔Correct answer-Facility and architectural
drawings

What type of design information is found on a telco\data IT coordination drawings? ✔Correct
answer-Locations of server, phone and ethernet lines, Wi-Fi access points

When producing shop drawings such as AV signal flow diagrams, what should be included?
✔Correct answer-Details of equipment configuration and interconnections

Where will the floor box dimensional and exact installation information be found? ✔Correct
answer-Detail drawings

What architectural document shows the details about the equipment mounting? ✔Correct
answer-Architectural drawings and notes

Document information

Uploaded on
August 28, 2025
Number of pages
28
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$22.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Studyclub
3.6
(14)
Sold
67
Followers
1
Items
13044
Last sold
21 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions