• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 24 pages
Exam (elaborations)

3rd Class Stationary Steam Engineer License (2025/2026) – Verified Questions and Answers

Document preview thumbnail
Preview 3 out of 24 pages

3rd Class Stationary Steam Engineer License (2025/2026) – Verified Questions and Answers This document contains verified questions and answers for the 3rd Class Stationary Steam Engineer License exam (2025/2026). It is designed to help candidates prepare effectively by covering essential concepts, safety regulations, operational procedures, and troubleshooting scenarios. With accurate solutions, this resource ensures clear understanding and targeted exam preparation.

Content preview

3RD CLASS STATIONARY STEAM
ENGINEER LICENSE WITH VERIFIED
QUESTIONS AND ANSWERS
2025/2026
_________ are necessary for complete combustion - CORRECT ANSWERS -time, temperature, mixture,
and atomization



if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - CORRECT ANSWERS -
214.7



a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The
blowdown is______psi - CORRECT ANSWERS -12



an oil cooler is commonly used with a(n) ________ when operating in conjunction with a turbo-
generator - CORRECT ANSWERS -steam turbine



a boiler is producing 40,000lb of steam/hr at a pressure of 100 PSI and a steam temperature of 500
degrees Fahrenheit. The steam produced is _______ steam - CORRECT ANSWERS -superheated



the economizer on a boiler is used to _______ - CORRECT ANSWERS -add heat to the feed water



blowers are normally used with________ boilers - CORRECT ANSWERS -water tube



overheating of tubes on a boiler can be caused by________ - CORRECT ANSWERS -scale on tubes



carbon dioxide in a condensate return system causes_________ - CORRECT ANSWERS -channeling

,a ________ pump is a positive displacement pump - CORRECT ANSWERS -reciprocating



a boiler generating 6000 lb of steam/hr produces _______btu/hr - CORRECT ANSWERS -6,000,000



a bottom blowdown is performed on a boiler to _____ - CORRECT ANSWERS -discharge sludge and
sediment



water columns are connected to the boiler with a minimum of _______" pipe - CORRECT ANSWERS -1



the minimum size of a water column blowdown valve is_______". - CORRECT ANSWERS -3/4



the maximum size bottom blowdown valve on a boiler is_________". - CORRECT ANSWERS -2 1/2



a ________ allows condensate to pass through, but stops Steam. - CORRECT ANSWERS -a steam trap



when taking over a shift, the first thing to do is check the________ - CORRECT ANSWERS -water level in
each boiler



according to the asme code, a high-pressure boiler having more than 500 square feet of heating surface
shall have________ - CORRECT ANSWERS -two or more safety valves



the probable cause of an increase in temperature of gases of combustion at the boiler Outlet is____ -
CORRECT ANSWERS -dirty heating services



boilers in battery equipped with________ must have two main steam stop valves and a free-flowing
drain between them - CORRECT ANSWERS -manhole openings

, in order to be sure the gauge glass is indicating an accurate water level reading, the stationary engineer
should______ - CORRECT ANSWERS -blowdown the gauge glass



a continuous blowdown line is located___ - CORRECT ANSWERS -in the Steam and water drum well
below the nowl



a temperature reading of 80 degrees Celsius is equal to_________°f - CORRECT ANSWERS -176



a chimney temperature of 250 degrees Fahrenheit above steam temperature indicates_______ -
CORRECT ANSWERS -poor efficiency



a manometer is red in________ - CORRECT ANSWERS -inches of water



the boiling point of water will____ with an increase in pressure - CORRECT ANSWERS -be raised



if a lather is not obtained when performing a soap hardness test, the water sample is_______ - CORRECT
ANSWERS -hard



combustion efficiency can be increased when air is________ - CORRECT ANSWERS -preheated



______ draft is produced by a fan located between the boiler and the chimney - CORRECT ANSWERS -
induced



the overspeed trip on a steam turbine should be tested ______ - CORRECT ANSWERS -before putting the
steam turbine on-line

Document information

Uploaded on
August 27, 2025
Number of pages
24
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
HIGHWESTSCORES
3.8
(4)
Sold
41
Followers
21
Items
479
Last sold
3 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions