OSIC STUDY GUIDE 1 QUESTIONS & ANSWERS
VERIFIED 100% CORRECT!!
what document establishes AIT requirements and procedures for the
accomplishment of modernization Answer - TS9090-310
what is required for an AIT to be authorized to install Alts/SCs? Answer - -
RMMCO check-in
-NSA check-in
-Must have accepted QMS
who is the single Naval Activity responsible for the integration, oversight, and
verification of all work accomplished by all activities? Answer - NSA
which areas are to be monitored by the osic? Answer - -production schedule
-quality of work
-compliance with requirements
T/F: AIT OSIC must be a government or military employee Answer - True
what QA documents are developed by the AIT for each alt and are required to
be on-site during install? Answer - QAWB
, Scenario: a design flaw was ID'd after approval of SIDs which necessitates a
drawing change. what doc shall be submitted to obtain approval of this SID
change? Answer - Liaison Action Record
QAWB Section 1 Answer - Alteration/SC description
QAWB Section 2 Answer - Personnel Records
QAWB Section 3 Answer - OQE- SIs, processes, approval letters, etc.
QAWB Section 4 Answer - Installation POA&M
QAWB Section 5 Answer - SC/ SIDs or Install Procedures
QAWB Section 6 Answer - Test and Inspection plan
QAWB Section 7 Answer - Test and inspection record
when should the OSIC meet with RMMCO Answer - Both before and after
install
what document is used by the OSIC to schedule and accomplish process
surveillance inspections on their AIT IAW the AMQAP? Answer - AIT's QMS
what are the responsibilities of the AITM? Answer - -manage AIT funding
-Review QAWB
-Monitor AIT execution
VERIFIED 100% CORRECT!!
what document establishes AIT requirements and procedures for the
accomplishment of modernization Answer - TS9090-310
what is required for an AIT to be authorized to install Alts/SCs? Answer - -
RMMCO check-in
-NSA check-in
-Must have accepted QMS
who is the single Naval Activity responsible for the integration, oversight, and
verification of all work accomplished by all activities? Answer - NSA
which areas are to be monitored by the osic? Answer - -production schedule
-quality of work
-compliance with requirements
T/F: AIT OSIC must be a government or military employee Answer - True
what QA documents are developed by the AIT for each alt and are required to
be on-site during install? Answer - QAWB
, Scenario: a design flaw was ID'd after approval of SIDs which necessitates a
drawing change. what doc shall be submitted to obtain approval of this SID
change? Answer - Liaison Action Record
QAWB Section 1 Answer - Alteration/SC description
QAWB Section 2 Answer - Personnel Records
QAWB Section 3 Answer - OQE- SIs, processes, approval letters, etc.
QAWB Section 4 Answer - Installation POA&M
QAWB Section 5 Answer - SC/ SIDs or Install Procedures
QAWB Section 6 Answer - Test and Inspection plan
QAWB Section 7 Answer - Test and inspection record
when should the OSIC meet with RMMCO Answer - Both before and after
install
what document is used by the OSIC to schedule and accomplish process
surveillance inspections on their AIT IAW the AMQAP? Answer - AIT's QMS
what are the responsibilities of the AITM? Answer - -manage AIT funding
-Review QAWB
-Monitor AIT execution