A thin layer of mix will cool at the same rate whether it is sunny or cloudy - ANSWERSFalse A transverse joint should be compacted in the longitudinal direction unless the roller cannot compact the joint because site restriction then it is permissible to be compacted transversely - ANSWERSFalse An approximate "rule of thumb" is for every _______ percent increase in air voids above (6 to 7%) about _______ percent of the pavement life may be loss - ANSWERS1 and 10 An end plate (or end gate or edger plate) is attached to the end of the screed to restrict the outward movement of the mix around the end of the screed - ANSWERSTrue An extremely high paver speed - more than ______, for thick lift, may cause a lack of responsiveness of the screed - ANSWERS83 feet per minute Butt joints are acceptable when traffic will not pass over the joint prior to the next paving operation - ANSWERSTrue Durang, rolling, rolling wheels, are kept moist with water, and only enough fuel oil to avoid picking up material - ANSWERSFalse Elimination of segregation is the responsibility of - ANSWERSThose who produce and lay assault mix State Highway Departments who approve the design of the mix and inspect the final product Manufacturers who designed the market machinery for the paving industry. For asphalt mixes, it can be expected that approximately ______ to _____ percent of the theoretical maximum density of the mix will be realized in the mix when it passes out from under a vibratory paver screed - ANSWERS70 to 80 If the air voids are above ______ percent for a SM-9.5A, the mix will be permeable to air and water, and will not have the required durability - ANSWERS7 to 8

Content preview

Asphalt 1 Test Review Questions with
Correct Answers

A thin layer of mix will cool at the same rate whether it is sunny or cloudy -
ANSWERSFalse

A transverse joint should be compacted in the longitudinal direction unless the roller
cannot compact the joint because site restriction then it is permissible to be compacted
transversely - ANSWERSFalse

An approximate "rule of thumb" is for every _______ percent increase in air voids above
(6 to 7%) about _______ percent of the pavement life may be loss - ANSWERS1 and
10

An end plate (or end gate or edger plate) is attached to the end of the screed to restrict
the outward movement of the mix around the end of the screed - ANSWERSTrue

An extremely high paver speed - more than ______, for thick lift, may cause a lack of
responsiveness of the screed - ANSWERS83 feet per minute

Butt joints are acceptable when traffic will not pass over the joint prior to the next paving
operation - ANSWERSTrue

Durang, rolling, rolling wheels, are kept moist with water, and only enough fuel oil to
avoid picking up material - ANSWERSFalse

Elimination of segregation is the responsibility of - ANSWERSThose who produce and
lay assault mix

State Highway Departments who approve the design of the mix and inspect the final
product

Manufacturers who designed the market machinery for the paving industry.

For asphalt mixes, it can be expected that approximately ______ to _____ percent of
the theoretical maximum density of the mix will be realized in the mix when it passes out
from under a vibratory paver screed - ANSWERS70 to 80

If the air voids are above ______ percent for a SM-9.5A, the mix will be permeable to air
and water, and will not have the required durability - ANSWERS7 to 8

, If the mat is being laid down at a facer rate, then it can be rolled, the solution should be
to ______ - ANSWERSSlow down the paver

Use larger, wider rollers.

Use more rollers

If traffic will pass over the end of the paving, a butt joint will be permitted, provided
proper compaction is achieved - ANSWERSFalse

If traffic will pass over the transverse joint, constructive slubbed wage, at least_____feet
per inch of pavement depth, ahead of end of the full debt payment to provide for proper
compassion and protection of the full depth pavement - ANSWERS3

It typically takes ___t ow lengths (the length between the toe point, and the screed) after
a desired level is input for a screed to arrive at the new level - ANSWERS5

Cold lane - ANSWERSA previously paved lane

Hot lane - ANSWERSA lane being currently placed

Joint overlap - ANSWERSThe width, that the hot lane overlaps the cold lane

The low-density areas on radiographic image are created by - ANSWERSThis area is
typically at the outer edge of the cold lane taper in the joint overlap area

Extra material for compression - ANSWERSThe material beyond the anticipated, final
mat thickness

Put the typical compaction train in order - ANSWERSScreed.

Breakdown roller

Intermediate roller.

Finish roller.

Traffic

Indentations that remain in the surface of the mix after the rolling has been completed,
are called roller marks - ANSWERSTrue

Roughness or wash boarding is normally caused by improper operations of____ -
ANSWERSA vibratory roller

Document information

Uploaded on
August 25, 2025
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
4
Followers
0
Items
1470
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions